Smeg KSE912NX manual Installation, Wall drilling and bracket fixing

Page 6

INSTALLATION

Wall drilling and bracket fixing

7.2.1

11 116 116

12a

650 min.

X 1÷2

320

Wall marking:

Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre of the area in which the hood will be installed.

Draw a horizontal line at 650 mm above the hob. Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the centre (notch) with the vertical reference line.

Mark the wall at the centres of the holes in the bracket.

Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the upper chimney section supplied), aligning the centre (notch) with the vertical line.

Mark the wall at the centres of the holes in the bracket.

Mark a reference point as indicated at 116 mm from the vertical reference line and 320 mm above the horizontal reference line.

Repeat this operation on the other side.

Drill ø 8 mm holes at all the centre points marked.

Insert the wall plugs 11 in the holes.

Fix the brackets using the 12a (4,2 x 44,4) screws supplied.

Insert the two screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 5-6 mm between the wall and the head of the screw.

EN

 

2

 

22

Image 6
Contents KSE951X KSE912X KSE912NX Index IndiceSommaire InhoudsopgaveÍndice Recommendations and Suggestions InstallationMaintenance USECharacteristics DimensionsComponents Installation Wall drilling and bracket fixingDucted Version AIR Exhaust System Mounting the hood bodyConnections Recirculation Version AIR OutletUpper exhaust Chimney Chimney assemblyElectrical Connection Lower exhaust ChimneyUSE Control boardCleaning MaintenanceAlarm reset Metal grease filtersLight Replacement LightingSubstitution of the Charcoal Filter