True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
SHELVING INSTALLATION / OPERATION
SHELF INSTALLATION:
Step 1
A.Hook shelf clips onto shelf standards. (see illustration).
B.Position all four shelf clips equal in distance from the floor for flat shelves.
WIRE SHELVES:
Wire shelves are oriented so that cross support bars are facing down.
Step 2 |
|
Place shelves on shelf clips making sure all corners |
|
are seated properly. | Shelf |
| Shelf |
| Shelf |
| Clip |
LIGHT SWITCH LOCATION:
Light switch location depends upon the TUC & TWT freezer glass door models. Most models will have the light switch located inside the unit above the door. Most instances the switch is located next to the light on the ceiling.
10 | www.truemfg.com | 10 |