Foster F60, F85, F20, F40 manual How the installation is made, Location, Start up

Page 3

location

A minimum clearance of 15cm (6 in) must be left at the sides of the machine for routing cooling air drawn into and exhausted out of the compartment to maintain a proper condensing operation.

Position the ice maker in its final location and make sure that there is everything for its installation, namely:

19

Fused switched power supply.

 

 

 

 

GB

english

 

26

 

33

 

 

 

 

 

 

 

The electrical isolator switch

 

Water drain is connected

 

 

must be fitted with the correct

 

and set-up properly using

 

 

fuse rating.

 

spiralled hose which

 

 

 

 

 

 

should have a minimum

 

 

 

 

 

 

fall of 3cm per metre.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

34

27

 

 

 

 

 

It is recommended that

The minimum ambient

 

 

 

 

 

 

 

 

the interior of the

temperature should not be

 

 

 

 

storage bin is cleaned

lower than +10˚C and the

 

 

 

 

with an appropriate mild

maximum ambient

 

 

 

 

disinfectant solution.

temperature higher than

 

 

 

 

 

+40˚C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

20

Water supply connection with shut-off valve.

21

Waste drain water connection.

22

Attention

Make sure that water available is connected to a cold drinking water supply. If in doubt consult the installer for the possible installation of a water filter or water conditioner.

To gain full advantage from this unit in terms of performance and durability also make sure that:

23

Minimum water temperature is not lower than +5˚C and maximum water temperature does not exceed +40˚C.

24

Minimum water pressure is not below 1 bar and maximum water pressure does not exceed 5 bar.

25

The electrical suppy available corresponds to machine specifications as indicated on the unit nameplate.

28

There are no heat sources (kitchen ovens, grills) near the machine and the environment is not too humid.

how the installation is made

Important

The machine installation has to be performed by Authorised Service Personnel

29

Connect the power lead to a suitable electrical supply

30

Check machine is level.

31

The level can be corrected by means of the levelling feet.

32

Make the connection to the water supply using the hoses supplied with the machine.

start up

35

Open water shut-off valve.

36

Plug in machine.

37

Switch the main switch to the ON position.At this stage the unit will start up.

38

The Authorised Service Agent will complete an inspection of the unit interior.

The first batch of ice cubes will drop into the storage bin approximately 30

minutes from start-up. The first batch of ice will

be of poor quality but subsequent batches will be good quality.

39

Attention

If the temperature of the room in which the machine is placed is below +15˚C, the freezing cycle length will be shorter (17 to 20 minutes).

40

Alternatively, if the room temperature is above +30˚C, the freezing cycle length will be longer (25 to 30 minutes).

3

Image 3
Contents Operating instructions Unit description Safety instructionsGB english PrefaceHow the installation is made LocationStart up GB english Installatie-instructies Français Comment linstallation doit être réaliséeFrançais DeutschInstallation DeutschDeutsch
Related manuals
Manual 23 pages 51.61 Kb

F60, F40, F20, F85 specifications

Foster F85, F20, F40, and F60 represent a remarkable lineup of industrial and commercial engines, celebrated for their reliability, efficiency, and advanced technology. These models cater to various applications, striking a balance between performance and economy.

The Foster F85 is designed for smaller machinery and equipment, perfect for light-duty tasks. It features a compact design that allows for easy installation in tight spaces. With a robust power output and energy-efficient operation, the F85 engine is coupled with advanced fuel injection technology that enhances performance and reduces emissions. Its low-maintenance requirements make it a favorite among operators looking for dependable machinery without extensive upkeep.

The Foster F20 escalates the performance, making it suitable for medium-duty applications. It boasts a higher torque output, allowing it to handle more demanding tasks while maintaining excellent fuel efficiency. The F20 integrates cutting-edge electronic control systems that optimize engine performance in real time. This model also features noise reduction technology, contributing to quieter operation in urban or sensitive environments.

Progressing to the Foster F40, this engine shines in heavy-duty applications, offering significant power and efficiency. With a robust design, the F40 is capable of withstanding harsh working conditions without compromising on performance. It features advanced thermal management systems that ensure optimal operating temperatures, enhancing engine lifespan and reliability. Moreover, the F40 incorporates modular components, promoting ease of repair and maintenance.

Lastly, the Foster F60 is the flagship model in this lineup and stands out for its exceptional power-to-weight ratio. It is engineered with the latest innovations in turbocharging, which provides increased horsepower while maintaining low fuel consumption. The F60 also integrates sophisticated diagnostic tools that help operators monitor performance and anticipate maintenance needs, thus minimizing downtime.

Across this range, Foster engines emphasize sustainability through reduced emissions and noise output, adhering to strict industry regulations. From the entry-level F85 to the high-performance F60, each model showcases Foster's commitment to engineering excellence and the evolving needs of industries. Whether for construction, agriculture, or commercial use, the Foster F series represents a wise investment for efficiency and reliability.