Installation Instructions
Re-installing the Drawer
1.Pull the drawer slides all the way out of the drawer opening.
2.Gently lower the drawer between the extended slides until the drawer is suspended by the slide rails.
3.Slide the back of the drawer mounting brackets under the drawer mounting clips on the slides.
4.Push the side of the drawer down onto its locking tab, until the tab locks into place.
5.Repeat the same process on the opposite side.
6.Gently open and close the drawer to make sure that it is properly installed.
STEP 3: Slide mounting |
|
| STEP 4: Push front of | |||
bracket under clip on |
|
| drawer down until tabs | |||
slide |
|
| lock into place | |||
|
|
|
|
|
|
|
Clip on slide |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Slide
Installation Checklist
WARNING
To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been overlooked.
Proper installation is the responsibility of the homeowner. The importance of proper installation of your warming oven cannot be
□□ Has a properly grounded, dedicated, three prong electrical outlet been installed for the appliance by a licensed electrician? See page 6.
□□ Has the mounting platform been installed according to the instructions on page 6?
□□ Has the chassis been properly fastened to the mounting platform and sides of the cabinet? See page 7.
□□ Has the drawer been properly installed? □□ Has proper operation been verified?
□□ Have any problems been noted on the warranty card or during the
Verifying Operation
1.Before connecting the power plug, turn the TEMPERATURE and TIMER knobs are set to the OFF position.
2.Plug the power cord into the electrical outlet.
3.Operate the warming drawer as outlined in the use and care manual that accompanied this product.
8