Zephyr ASL-E48ASX, ASL-E42ASX installation instructions

Page 22

www.zephyronline.com

- 22 -

Image 22 Contents
Range Hood Installation instructions ASL-E42ASX ASL-E48ASXHotte PER Cuisine Notice d’utilisation...Pag Contents InstallationImportant Safety Instructions For Residential USE only Safety instructionsPlease Read Entire Instructions Before Proceeding Installation Instructions MAY List of Materials Ducting Calculation Sheet Maximum Duct LengthHood Specifications Installation Internal Blower For external and in-line blower preparation please turn toHood is now ready to be installed on the wall Installation External & In-Line Blower Preparation Installation External & In-Line Blower Preparation Installation Ducting Options Mounting Heights InstallationMounting the Range Hood Mounting to the CeilingInstallation Mounting the Range Hood Insert the bottom support frame into the top support frame Power Supply Connection Installation Power Supply Connection General Installation Power Supply Connection Maintenance MaintencanceDescription Hood PART# Replacement Parts List of Parts and AccessoriesOptional Accessories Page 3LIK0510