Proline PLZW697, PLZWKL2, PLZWKF, PLZWKE, PLZIGS2, PLZIGL7, PLZIGL9 Hood Insert Installation, Step

Page 18

14PROLINE RANGE HOODS

HOOD INSERT INSTALLATION

STEP 1

Mark the leveling point of the hood. Position two mounting screws on the wall leaving 1/8” space between the wall and your hood. If you are installing under a cabinet, the hood should be flush with the front of the cabinet. Make sure you mount the hood on wall studs or lumbars for secure placement.

STEP 2

Attach the hood-mounting bracket to the back of the hood with the six screws provided.

STEP 3

Puncture the knockout wire access hole at the back of the hood and pull the electrical wires through the back.

Image 18
Contents Proline Proline Customer Support Team Table of Contents Important Safety Notice To reduce the risk of a range top grease fire Wall or Island Hood Control Panel Grease Filters Baffle filterDuctless Filters Charcoal filterVertical Roof Venting Venting OptionsHorizontal Wall Venting OptionVenting Requirements Height & Venting RequirementsTools YOU’LL Need PreparationInspect Range Hood Prepare DuctworkWall Hood Installation Install anchors and screwsInstall ceiling bracket Hang hood and connectInstall chimney Install grease filterInstall support brackets Mark ceilingInstall Filters Attach HoodHood Insert Installation StepHood Insert Installation Care & Cleaning Cleaning Exterior SurfacesRemoving the filter Replacing the Light BulbTroubleshooting Nothing Works Control Panel not lit, Blower not workingOne Year Warranty Parts Only WarrantyTwo Year Warranty Parts & Labor What is not CoveredReturns Upon Receipt of Your HoodReturns Return Claims not Accepted if ExchangesExchanges Please NoteProline Range Hoods