1.Puncture the knockout holes on the hood as shown in Figure 4.
2.Unscrew the six screws on the bottom casing. Remove the bottom casing. If ne arrange the electrical wires to run through the 1 diameter hole on the hood. Figure 5.
3.Using references on Table 1 and measurements on page 21, center the hood in pl beneath the cabinet and flush with the front of the cabinet.
1 Diameter
Figure 4
4.Draw electrical wires through cabinet access opening.
5.Place screw (not provided) into the exact center of each knockout hole. Make screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING.
Ductwork Installation
6.Use aluminum or steel pipe to connect the plastic exhaust on the hood to the d above. Use duct tape to make all joints secure and air tight.
7.Continued on page 16.
7