INSTALLATION
PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING
Calculation before Installation
To calculate the length of the installation, please refer to Table 1. (All calcula inches.)
TABLE 1
A = Height of Floor to Ceiling
B = Height of Floor to Counter Top (Standard: 36)
C = Preferred Height of Counter Top to Hood Bottom (Recommended 27 to 30)
D = Height of Hood
E = Height of the Hood Installation [A (B+C)]
F = Height of Duct Cover [E D]
SAFETY WARNING
HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF IT IS NECESSARY TO REMOVE ANY PARTS FOR INSTALLING, CLEANING OR SERVICING.
Preparations before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.
-Decide the location of the venting pipe from the hood to the outside. Refer
-A straight, short venting run will allow the hood to perform more efficientl
-Try to avoid as much transitions, elbows, and long run as possible. This ma the performance of the hood.
-Use duct tape to seal the joints between pipe sections.
-If necessary, prepare back wall frame with cross framing lumber for secure i Using references on Table 1 and measurements on page 12 decide the level of t lumber. Refer to Figure 2.
4