Kobe Range Hoods CH0030SQB manual To Avoid Damage to Your

Page 10

STAND ALONE INSTALLATION

***This

installation only

applied with the

 

 

 

 

Figure 8

purchase of an optional duct cover:

 

 

Preparation before Installation

 

NOTE:

TO AVOID DAMAGE TO YOUR

 

HOOD, PREVENT

DEBRIS

FROM

 

ENTERING THE

VENT OPENING.

Decide the location of the venting pipe from the hood to the outside. Refer to Figure 8.

A straight, short venting run will allow the hood to perform more efficiently.

Try to avoid as many transitions,Figure 9 elbows, and long run as possible. This

may reduce the performance of the hood.

Use duct tape to seal the joints between pipe sections.

If necessary, prepare back wall frame with cross framing lumber for secure installation.

Using references on Table 2 and measurements on page 14-15, decide the level of the lumber. Refer to Figure 9.

Hood Preparation before Installation Figure 10

Temporarily wire the hood to test for proper operation before installing.

Important: Peel protective film off the hood and the duct cover (if any).

Attach the two hood-mounting brackets to the back of the hood with (3/16￿ x 3/8￿) screws (provided) as shown In Figure 10.

Hood Installation

CAUTION: If required to move the cooking

Figure 11

range to install the hood, turn off the power on an electric range at the main

electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE.

1.Using references on Table 2 and measurements on page 14-15, mark the leveling point of the hood. Position two mounting screws (not provided) on the wall, leaving 1/8￿ away from the wall as shown in Figure 11.

8

Image 10
Contents Kobe Brand Range Hood Read and Save These Instructions Page Activating any switch on may cause ignition or an explosion Components of Package Range Hood BOXInstallation Please Read Entire Instructions Before ProceedingSafety W Arning Hood MAY OccurUnder the Cabinet Installation HOOD, Prevent Debris from Entering the Vent OpeningWiring to Power Supply To Avoid Damage to Your HOOD, Prevent Debris From Entering Vent OpeningDuct Cover Installation Install Accessories Turn on Operation InstructionsTurn OFF Maintenance    Specifications Model NO. CH 0030SQB Model no Measurements & DiagramsCH0036SQB CH0042SQB Rear Knockout Holes Parts List Model NO. CH00 30SQB CH0036SQB CH0042SQB CH0048SQBOptional Duct Cover Model NO. CH00 30SQB CH0036SQB Model NO. CH0042S QB Model NO. CH0048 SQB Circuit Diagram Model NO. CH0042 SQB CH0048SQB Disclaimer Claims will not be Accepted After the Allocated DaysTWO-YEAR Warranty Service Period WarrantyWarranty Certificate ConditionsConsequential Damage ServiceApply to YOU Implied WARRANTIES/STATE LAW Product Registration Record the Following Information for Your Record