Harbor Freight Tools 93011 manual Troubleshooting, INSPECTION, MAINTENANCE, and Cleaning

Page 11

TROUBLESHOOTING

The Boiler Unit (8) fails to produce steam.

1.Check that the Power Cord (12) is properly plugged into the wall outlet and the Boiler Unit (8).

2.If the safety cut-off engaged, it will need ample time to cool and reset.

3.The safety cut-off device was damaged from working with a tilted unit.

The Boiler Unit (8) leaks steam from the pressure release valve.

1.The pressure release valve is a special low pressure valve that cannot be replaced by another valve. If steam leaks from the valve, the most likely cause is a blockage in the steam Hose (4). Allow the unit to cool and check the Hose (4) for blockages.

INSPECTION, MAINTENANCE, AND CLEANING

1. WARNING! Make sure the unit is unplugged from its electrical outlet and thoroughly cooled down before performing any inspection, maintenance, or cleaning procedures.

2.BEFORE EACH USE, inspect the general condition of the Wallpaper Steamer. Check for loose screws, misalignment or binding of moving parts, cracked or broken parts, damaged electrical wiring, and any other condition that may affect its safe operation. If abnormal noise or vibration occurs, have the problem corrected before further use. Do not use damaged equipment.

3.Wipe down the unit and dry the accessories with the Rag (10).

4.Areas with hard water, or when using tap water, will eventually leave a scaly film on the element in the Boiler Unit (8). Use an over-the-counter descaling product to clean out the Boiler Unit (8). Follow the descaling product manufacturer’s instructions.

SKU 91098

PAGE 11

Image 11
Contents For technical questions, please call Wallpaper SteamerWork Area Product SpecificationsGeneral Safety Rules Save this ManualPersonal Safety Electrical SafetyTool USE and Care Specific Safety RulesService Never point the Hose 4 or any attachment at anyone Do not use the Steamer if the Power Cord 12 is damagedSee Figure a GroundingGrounded Tools Tools with Three Prong Plugs See Figure C Extension CordsDouble Insulated Tools Tools with TWO Prong Plugs See Figure C, nextExtension Cord Length SymbologyFilling The Boiler Unit Assembly and Operating InstructionsConnecting the Steam Hoses UnpackingWallpaper Stripping Operating InstructionsBoiler Unit 8 leaks steam from the pressure release valve TroubleshootingINSPECTION, MAINTENANCE, and Cleaning Boiler Unit 8 fails to produce steamPlease Read the Following Carefully Assembly Diagram Parts List