UNPACKING
When unpacking, check to make sure all the parts shown on the Parts List on page 12 are included. If any parts are missing or broken, please call Harbor Freight Tools at the number shown on the cover of this manual as soon as possible.
ASSEMBLY AND OPERATING INSTRUCTIONS
NOTE: For additional information regarding the parts listed in the following pages, refer to the Assembly Diagram on page 12.
Caution: Always make sure the Power Cord of the Wallpaper Steamer is unplugged from its electrical outlet and the unit is cool prior to making any adjustments on the tool.
Filling The Boiler Unit (8).
Refer to the Assembly Drawing on page 12.
1.Remove the Filler Cap (5).
2.Fill the Boiler Unit (8) with clean, hot water all the way to capacity. Replace the Filler Cap (5). Note: At full capacity, the unit should heat up in approximately 25 minutes, and produce steam for 140 minutes.
Warning!! Do not overfill the Boiler Unit (8) or water will be forced up the steam hose, burning the operator and damaging the unit. A safety
Connecting the Steam Hoses.
Refer to FIGURES 1 and 2 below.
Note: The Hose and attachments are all threaded. Always thread the plastic parts gently. Forcing plastic threaded parts may break them, damaging the product.
1.When connecting the Nozzle (7), Steam Plate (6), or Brush (1) to the Hose (4), gently thread on the appropriate attachment as shown in FIGURE 1.
2.FIGURE 2 shows how to disconnect the Brush(1), Connector(3), Long Pipes (9), or Brush Handle (2).
FIGURE 1
FIGURE 2
SKU 91098 | PAGE 9 |