Hunter Fan 83006 manual B11, B12, B13, B15, New Construction suspended between joists

Page 8

New Construction – suspended between joists

B11

F

E

Slide the mounting rails into brackets.

B12

5/8

5/8

1/2

1/2

 

Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock.

B13

B14

F

1/8” bit

Mark position of screws by using holes as a template.

Drill a hole in the center of each outline.

B15

Insert screws, leaving space between the screw head and the joist. Screws are not provided.

8

HF0022_Eng_3.13.06.indd 8

B16

Attach the rails onto the screws.

41954-01 3/13/2006

3/12/06 6:03:05 PM

Image 8
Contents Installation I d e Preventative Maintenance Before Installation X2 DRemove the motor/blower from the housing A12 A14 A15A21 A22 A18A19 B11 B12B13 B15B20 B17B19 B22 B23B24 B26 B27Existing Construction accessible from above C11C13 C12 C14C15C16 C17C23 C21C22 C29 C25 C26C28 Existing Construction accessible only from below D11D12 D13D19 D16D17 D18 Attaching the Grille D22D23 Screw glass dome into position Trouble Shooting SolutionWarranty Limited WarrantyDesde Í a S t a l a c i ó nPrecaución Antes de la instalación Llame al Para un reemplazoHF0022Sp3.13.06.indd 12/06 60048 PM Construcción nueva fijación a la viga Tienda los cables a través del alivio de tension A21 Vaya al pasoConstrucción nueva suspendido entre vigas De pulgApriete los tornillos B26 B23SIN Ventilador Existente Construcción existente accesible desde arribaTaladre un agujero en el centro de cada perfil Apriete los tornillos del aliviador de tensiones Vaya al paso En la página 37 para Fijar la rejilla Construcción existente accesible sólo desde abajo D20 Fijación de la rejilla Retire los tornillos de manoEnrosque el dome vidrio en su posición Solución de problemas SoluciónGarantía Garantía Limitada