Faber 630003952 Plan Your Ductwork, Make Your CUT-OUTS, CUT-OUT Install the Rangehood

Page 6

ATTENTION

This rangehood is designed to be connected to a remote blower (pur- chased separately). CAUTION: To reduce the risk of fire and electric shock, install this rangehood only with remote blowers rated a maxi- mum 1.8 Amp, suitable for use with solid state fan speed controls. The remote blower requires a separate wiring cable that should be installed at the same time that the ductwork is installed. For best results, 10” duct is recommended for the remote blower.

PLAN YOUR DUCTWORK

To ensure that the blower performs to its highest possible capacity, ductwork should be as short and straight as possilbe.

The ductrun should not exceed 55 equivalent feet if ducted using the required minimum of 10" round duct. Calculate the length of the ductwork by adding the equivalent feet in FIG- URE 2 for each piece of duct in the system An example is given in FIGURE 3.

45˚ Elbow

 

3.0 feet

90˚ Elbow

 

5.0 feet

90˚ Flat Elbow

12.0 feet

Wall Cap

 

0.0 feet

FIGURE 2

 

 

 

 

 

 

 

 

 

 

9 Feet Straight Duct 9.0 feet

2 - 90˚ Elbows

10.0 feet

Wall Cap

 

0.0 feet

 

Total System

19.0 feet

FIGURE 3

For best results, use no more than three 90° elbows. Make sure that there is a minimum of 24" of straight duct between elbows if more than one is used. Do not install two elbows together. If you must elbow right away, do it as far away from the hood's exhaust opening as possible.

MAKE YOUR CUT-OUTS

1.Disconnect and move freestanding range from cabinet opening to provide easier access to upper cabinet or custom hood. Put a thick, protective covering over cooktop, set-in range or countertop to protect from damage or dirt.

2.Determine and clearly mark with a pencil the center line on the cabinet or custom hood where the rangehood will be installed.

3.Determine and make all necessary cuts in the wall and/or ceiling for the ductwork. Install the ductwork before the rangehood.

4.Determine the proper location for the Power Supply Cable. Use a 1 1/4" Drill Bit to make this hole. Install the cable. Use caulking to seal around the hole. DO NOT turn on the power until installation is complete.

5.Make the cut-out opening where the rangehood will be installed (FIGURE 4).

28 7/8"

 

 

 

 

 

CUT-OUT

14

 

5/8"

 

 

 

 

 

 

 

 

 

 

 

FIGURE 4

INSTALL THE RANGEHOOD

1.Remove the rangehood , as seen in (FIGURE 5) from the carton and place on a flat surface. Cover the surface to prevent accidental damage. Remove all parts including the literature package before discarding the carton.

FIGURE 5

Version 03/08 - Page 6

Image 6
Contents Lisez Bien Cette Fiche Avant Dinstaller LA Hotte Inca PRO 30 RBElectrical Requirements Venting RequirementsDuctwork For residential use onlyFiche Technique Électrique Règlements DévacuationLe système dévacuation Doit sortir à lextérieur Uniquement pour usage menagerPeut être employée les hottes encastrable sur mesure de For Installations with Liners Inca Pro 30 can be used with custom hoods 30 wide and upCUT-OUT Install the Rangehood Plan Your DuctworkMake Your CUT-OUTS Volt white supply wire Remove the two philips screws D in . Remove the entireUSE and Care Information Faber Warranty & Service Save for Your Records Installations Avec Cadres Dimensions DE LA Hotte ET Dimensions DU Cadre à laInstallation DE LA Hotte à la Plan DU Conduit Faire LA CoupeCUT-OUT Installation DE LA Hotte Utilisation ET Entretien Enregistrez Votre Information Ci-dessous