Architectural Series™
BPS - 1 I N - C E I L I N G S U B W O O F E R
I N S T A L L A T I O N M A N U A L
NOTE: DO N OT U S E N A I L S TO AT TA C H T H E TE M P O R A R Y BR A C K E T S — T H E Y W I L L B E R E M O V E D A F T E R T H E BPS
5. Remove the Drilling Template from the joist.
6. Place the
drilled in the joist.)
7. Screw the eight included lag |
| ||
screws through the holes in |
| ||
the joist and into the holes in |
| ||
the side of the |
| ||
as shown in Figure 5. Use the |
| ||
shorter lag screws for |
| ||
construction; use | the longer |
| |
lag screws for standard joist |
| ||
construction. |
|
|
|
8. After confirming | that | the | 5/16” |
BPS - 1 cabinet is securely | Lag Screws | ||
| |||
attached to the joist, remove |
| ||
the temporary brackets | from | Figure 5: Using the Included Lag Screws to Attach the | |
the underside of the joists. |
|
Selecting the Proper Adaptor Baffle
Sonance has
Select the Adaptor Baffle that fits the particular size and shape Architectural Series Panel Bracket you installed. BPC8R/S fit 8” Panel Brackets, BPC6R/S fit 6” Panel Brackets, BPS4R/S fit 4” Panel Brackets (see Figure 6).
Figure 6: BPS-1 Adaptor Baffles (left to right): BPC8S, BPC8R, BPC6S, BPC6R, BPC4S, BPC4R
The Adaptor Baffles include Allen screws, an Allen wrench and Locktite.
Page 3 of 8