Cleveland Range PDM, PGM, PEM, PSM, PDL-2/3 manual Table of Contents

Page 2

Operator’s ManualP/N-260APC-A

Table of Contents

 

INSTALLATION

3

Correct Installation

3

Water Quality

3

Drain Line Connection

4

Installation Safety

4

Installation Instructions

5

Installation checks

5

Gauge Pressure Reading with No Steam Flow* (Static Pressure)

7

OPERATION

7

Controls and Controls Panels

7

Steam Generator Controls

7

Start-up and Preheat

8

Cooking Operations

8

Startup and Preheat

9

Cooking Operation

9

Boiler Shutdown

9

Care and Cleaning

9

MAINTENANCE

10

Preventative Maintenance-Descaling Instructions

11

TROUBLESHOOTING

15

Operators Troubleshooting Guide

16

Troubleshooting Notes

16

PRESSURE STEAMER COOKING INFORMATION

17

2

Image 2
Contents Installation, Operation & Maintenance Manual Table of Contents Correct Installation Operator’s ManualInstallation Safety Installation Checks For Direct-Steam Connected Steamers and KettlesSelf-Contained Steam Coil Generator Operation START-UP and PreheatBoiler Shutdown Care and CleaningCooking Operation Preventive Maintenance and Record Keeping DailyDescaling Procedure Overview Pump Descaling Procedures Dissolve Order QuantitiesEquipment Setup DescalingFlushing Troubleshooting Troubleshooting Notes ProblemVegetable Steaming IntroductionMeat DessertsVegetable Pressure Steam Cooking Chart Beans, Green