American Panel
AP20BC175-2
user manual
The P.C. baud rate should be left at
Install
Parts list
Wiring Diagrams
Warranty
Dimension
Maintenance
Maintenance And Cleaning
Starting & Testing The Unit
Controller Features
Page 17
Page 16
Page 18
Image 17
Page 16
Page 18
Contents
REV. C
American Panel Corporation
E-mail service@americanpanel.com
USER’S MANUAL
INSTALLATION
INSTALLATION OF REMOTE UNITS
USING THE HURRICHILL TECHNOLOGY
INDEX
WIRING DIAGRAMS
MAINTENANCE AND CLEANING
PARTS LIST
STANDARD WARRANTY
OPERATING MODES
CONTROLLER FEATURES
INTRODUCTION
ADDITIONAL CYCLES
OPERATING CYCLES
PRINTER
PC CONNECTION OPTIONAL
INSTALLATION AT THE SAME LEVEL
INSTALLATION OF REMOTE UNITS
REQUIREMENTS TO BE MET DURING INSTALLATION 8 STEPS
CONNECTION PIPING FOR REMOTE CONDENSING UNITS
INSTALLATION AT DIFFERENT LEVELS
INSTALLATION
INSTALLATION
DIMENSIONS
ELECTRICAL AND REFRIGERATION SPECIFICATIONS
CONDENSATE DRAINAGE CONNECTION
VERIFYING CORRECT INSTALLATION
CONNECTION TO THE REMOTE UNIT
SPACES AROUND THE CABINET
STARTING & TESTING THE UNIT
BLAST CHILLING
USING THE HURRICHILL TECHNOLOGY
SHOCK FREEZING
SOFT CHILL CYCLE
LOADING
PANNING AND LOADING
PANNING
CONTROL PANEL FOR MODEL AP20BC175-2 BLAST CHILLER
KEY COMBINATIONS
KEYBOARD KEYS
ON/OFF & START/STOP
PROGRAMMING KEYS
1. INITIAL PROGRAMMING
PROGRAMMING
The low air alarm temperature should be left at
The high air alarm temperature should be left at
The high food alarm temperature should be left at
The low food alarm temperature should be left at
The printer baud rate should be left at
The P.C. baud rate should be left at
AUTOMATIC SOFT CYCLE PARAMETERS PROGRAMMING
2. PROGRAMMING THE CYCLES
AUTOMATIC HARD CYCLE PARAMETERS PROGRAMMING
p. To change the temperature, press
DEFROST CYCLE PARAMETERS PROGRAMMING
then press
q. To change the temperature, press
MANUAL SOFT CYCLE PARAMETERS PROGRAMMING
MANUAL HARD CYCLE PARAMETERS PROGRAMMING
3. RECIPE NAME PROGRAMMING
1. AUTOMATIC MODE - SOFT CHILL
OPERATION
alternating
2. MANUAL MODE - SOFT CHILL
4. DEFROST CYCLE
3. HARD CHILL CYCLE
b. Open the door
6. TO CLEAR DATA
5. PREPARING AND USING THE PRINTER
PRINTER
LOADING A ROLL OF PAPER
MAINTENANCE
REMOVING A ROLL OF PAPER
OPERATING THE PRINTER
REPLACING THE RIBBON WITH PAPER IN THE PRINTER
MAINTENANCE AND CLEANING
CLEANING THE STORAGE COMPARTMENT
WIRING DIAGRAMS
CLEANING THE CONDENSER
AP20BC175-2 Manual
AP20BC175-2 Manual
AP20BC175-2 Manual
COMPUTER CONNECTION
DESCRIPTION
PARTS LIST
PART #
installing contractor. It is not covered by this Warranty
STANDARD WARRANTY
AMERICAN PANEL CORP
5800 S.E. 78th Street, Ocala, Florida
ORDERING PRINTER SUPPLIES RIBBON & PAPER
Related pages
Troubleshooting for LOREX Technology SG8840
Specifications for Panasonic PT-LB10NT
Error Messages for HP MPE/iX 6.x Operating System
Circuit Diagram for Rangemaster RI60
How to Use the Processes Screen for Cisco Systems 1.0 (1)
Outil d’installation des tweeters for Polk Audio SR52505
Parts List for Boss Audio Systems GT1280
Language code list for Samsung HT-C450N/XEF
Specifications for Multi-Tech Systems DT102
How to program the
NN-SA631B microwave
correctly?
Top
Page
Image
Contents