Allied Telesis 6870 manual Putting a Very Small Sample in the Vial and Keeping it Cold

Page 17

Accessory Packs can be placed in an insulated container to hold the vials upright during chilling. At the same time, chill an impactor separately. As soon as the submerged end of the vial is chilled, drop in the cold sample and then the chilled impactor. (Always wear insulated gloves when handling chilled vial components directly!) Now carefully insert the other end-plug, still warm, into the warm end of the cylinder. The vial can now be carefully placed in the mill, or submerged in a liquid nitrogen bath outside the mill, as long as you are careful not to let the sample touch the warm end plug before it has cooled down.

Very important: never force an end plug (warm or cold) into a cold polycarbonate cylinder. Polycarbonate shrinks when chilled, and can crack if stressed. When you follow this procedure for loading cold samples, if the cylinder has cooled to the point where the end-plug fit is too tight, warm the end of the cylinder before inserting the end-plug.

6.25 Putting a Very Small Sample in the Vial and Keeping it Cold

A variant of the loading technique in 6.24 can be used to grind very small samples with the open pre-chilled vial upright. Place the sample on the chilled end-plug and add a small amount of fluid such as an extraction medium or water. The frozen fluid will bulk up the sample enough so it will circulate in the vial during grinding. To speed up this process with Small-sized vials like the 6751, some users first prepare small “ice cubes” of the sample frozen together with 0.5 ml to 1 ml of fluid.

6.26 Placing Vials in the Freezer/Mill Coil

Before placing a vial or vials in the 6870 Freezer/Mill, put on cryogenic gloves. Unlatch and lift the lid of the mill, and open the coil gate. If you are running Small or Mid-Size vials make sure the proper Adapter is in the coil. Pick up the vial(s) with your gloved hand or an Extractor/Vial Opener and insert the vial(s) in the coil. Close the coil gate and tighten it against the vials(s) by turning the gate handle clockwise, but do not overtighten the gate. Lock the gate by folding down the handle.

If you have additional vials you wish to pre-cool, pick them up the same way and insert them in the pre-cooling compartment of the coil housing. Check the liquid nitrogen (LN) level and top it off if necessary. Gently close the Freezer/Mill lid, and latch it. Latch the lid shut. You are now ready to run a grinding program, as described in Section 5.

6.3Removing, Opening, Emptying, and Cleaning Freezer/Mill Vials

6.31Removing Vials from the Freezer/Mill

At the conclusion of the grinding cycle, unlatch the lid and let the gas cylinders lift it. Do not force the lid, but allow it to rise at its own speed. If the gas cylinders are too worn or chilled to lift the lid, lift the lid gently.

Remove the vial or vials from the coil, using gloves or an Extractor/Vial Opener. At this point you may want to shut the lid to conserve LN or insert another vial and begin another grinding cycle.

Page 17 of 25

SPEX SamplePrep LLC

9.24.07

Image 17
Contents This manual is part number FREEZER/MILLTable of Contents Introduction Safety NotesSafety Features 6870 FREEZER/MILL SpecificationsType of mill cryogenic impact mill Typical Sample CapacityUnpacking Electrical Hookup Setting UPPower Switch and Control Panel Lid and Lid Latch, Coil Assembly and Coil Gate, LN Sensor Grinding Vial Sizes, Adapters, and Vial Openers Logo Screen Current Settings ScreenTouchscreen Displays Status Screen RateStatus Screen during a run Settings Screen Settings ScreenStoring a new program STORE/RECALL ScreensAdding Liquid Nitrogen Coolant Recalling a programPractical Operation Section Putting a Cold Sample into the Vial and Keeping it Cold Putting a Sample into the Vial at Room TemperatureSize of Sample Pieces Placing Vials in the Freezer/Mill Coil Putting a Very Small Sample in the Vial and Keeping it ColdEmptying the Vials Opening the VialsCleaning the Vials Checking The Liquid Nitrogen Level 6820 Auto-Fill System Description, Installation, OperationMaintenance Warranty Warranty and ServiceProduct Specifications To Arrange a Return ShipmentDalston Gardens Stanmore, HA7 1BQ Great Britain Contacting Spex SamplePrep LLCSpex SamplePrep LLC Liberty St Metuchen, New Jersey Problem Cause Solution TROUBLE-SHOOTING GUIDE, page 1TROUBLE-SHOOTING GUIDE, page 2

6870 specifications

The Allied Telesis 6870 is a robust Layer 3 Ethernet switch designed for high-performance networking in enterprise environments. Incorporating advanced features and technologies, it serves as a vital component in managing complex network infrastructures, ensuring seamless connectivity, reliability, and enhanced performance.

One of the standout characteristics of the 6870 is its support for a high number of Gigabit Ethernet ports. With multiple SFP and SFP+ ports, the switch allows for flexibility in connecting various devices, while also facilitating the use of different physical media. This capability is crucial for organizations that demand versatile connection options, particularly when managing diverse networking equipment.

The switch is equipped with advanced Layer 3 routing capabilities, allowing it to perform IP routing functions in addition to standard Ethernet switching. Suitable for traffic management, the switch supports protocols such as OSPF, RIP, and static routing, enabling efficient and intelligent path selection in larger networks. This functionality is essential for optimizing bandwidth usage and maintaining an efficient data flow throughout the network.

Another highlight of the Allied Telesis 6870 is its support for VLANs (Virtual Local Area Networks). VLANs enable network segmentation, improving security and performance by isolating different segments of traffic. This capability is further enhanced by the switch's support for advanced features like Ingress/Egress Rate Limiting and Quality of Service (QoS). These features allow network administrators to prioritize critical applications and ensure that bandwidth is allocated effectively.

The switch also incorporates the innovative Allied Telesis Autonomous Management Framework (AMF), which simplifies device management and network configuration. With AMF, administrators can manage multiple switches as a single logical entity, reducing operational complexity and minimizing downtime. This technology supports zero-touch provisioning, enabling rapid deployment and configuration of network devices.

Security is another key aspect of the 6870, with features such as Access Control Lists (ACLs) and IEEE 802.1X port-based authentication. These measures help protect the network from unauthorized access and ensure that only authenticated devices can connect to the network.

In summary, the Allied Telesis 6870 is a versatile and powerful switch that meets the demands of modern enterprise networks. With its comprehensive feature set, including high-performance routing, VLAN support, and advanced management capabilities, it offers a reliable solution for organizations seeking to optimize their network infrastructure. Whether for deploying new services or managing existing traffic, the 6870 stands out as a formidable choice for network administrators.