Allied Telesis 6870 manual Lid and Lid Latch, Coil Assembly and Coil Gate, LN Sensor

Page 7

The control panel is a touch-screen, activated by a stylus. The Freezer/Mill is programmed and operated through this control panel, whose successive screens are described and illustrated in Section 5, starting on page 8. Programmable parameters include pre-cooling time, grinding time, cooling time between grinding periods, the number of grinding periods, and the rate of grinding. The control display also warns if the lid is not fully closed, or if there is not enough liquid nitrogen in the tub.

4.3 Lid and Lid Latch, Coil Assembly and Coil Gate, LN Sensor

The lid of the 6870 Freezer/Mill supports the coil (dual electromagnet assembly) and coil housing. To open the lid, hold the lid down with one hand, and with the other pull the upper end of the latch toward you. The lower end of the latch should disengage from the cabinet. Release the lid and it should be pushed up by the gas cylinders, which also keep the lid raised when open. The lid must be open to put vials in the coil and take them out. Liquid nitrogen (LN) is added with the lid open, unless the 6870 is equipped with the 6820 Auto-Fill System.

The lid must be shut and latched for the Freezer/Mill to run. Push the lid down, hold it down while engaging the latch, then lock the latch by pushing its top end toward the cabinet.

The circular hole on the right side of the coil housing is where to insert a vial for grinding. The coil gate keeps the vial or vials in place during grinding, but must be lowered to insert or remove vials. The rectangular space toward the top of the coil housing is for pre-cooling loaded vials. (Do not run the 6870 Freezer/Mill without a loaded vial in the coil.)

The coil gate holds the vial or vials in the coil during grinding. To lock a vial in place, loosen (unscrew) the coil gate handle a turn or two, and position it so the handle passes through the slot in the coil gate when the gate is raised. Tighten the coil gate handle against the gate, so the gate contacts the vial snugly, but do not overtighten the gate as this can crack the plastic center section of the vial. When the coil gate handle is properly tightened, fold it down to lock the gate during grinding. Always use the proper Adapters for Mid-Size and Small vials (see 4.4), and

always wear gloves when touching a chilled vial or any part of the chilled coil housing!

The LN sensor is behind a shield on the back wall of the LN tub. If there is not enough liquid nitrogen in the tub to start the mill, when RUN is touched the STATUS screen (p. 10) will display STATUS: LOW LN LEVEL. If the LN runs low during a grinding program the same message will appear and the program will stop. To continue running, fill the tub with liquid nitrogen to the mark. When RUN is pressed, the grinding program will start over.

To keep a run from being interrupted by the liquid nitrogen (LN) sensor, the LN level should be visually checked from time to time during extended runs, as well as before every run. The 6870 Freezer/Mill can run low on LN during extended runs, so should be checked after each 30 minutes of grinding time, and the LN topped off if necessary. The Freezer/Mill warranty does not cover damage to the coil caused by operating the mill with little or no liquid nitrogen.

Page 7 of 25

SPEX SamplePrep LLC

9.24.07

Image 7
Contents This manual is part number FREEZER/MILLTable of Contents Introduction Safety NotesTypical Sample Capacity 6870 FREEZER/MILL SpecificationsSafety Features Type of mill cryogenic impact millUnpacking Power Switch and Control Panel Setting UPElectrical Hookup Lid and Lid Latch, Coil Assembly and Coil Gate, LN Sensor Grinding Vial Sizes, Adapters, and Vial Openers Touchscreen Displays Current Settings ScreenLogo Screen Status Screen RateStatus Screen during a run Settings Screen Settings ScreenStoring a new program STORE/RECALL ScreensPractical Operation Recalling a programAdding Liquid Nitrogen Coolant Section Size of Sample Pieces Putting a Sample into the Vial at Room TemperaturePutting a Cold Sample into the Vial and Keeping it Cold Placing Vials in the Freezer/Mill Coil Putting a Very Small Sample in the Vial and Keeping it ColdEmptying the Vials Opening the VialsCleaning the Vials Checking The Liquid Nitrogen Level 6820 Auto-Fill System Description, Installation, OperationMaintenance To Arrange a Return Shipment Warranty and ServiceWarranty Product SpecificationsSpex SamplePrep LLC Liberty St Metuchen, New Jersey Contacting Spex SamplePrep LLCDalston Gardens Stanmore, HA7 1BQ Great Britain Problem Cause Solution TROUBLE-SHOOTING GUIDE, page 1TROUBLE-SHOOTING GUIDE, page 2

6870 specifications

The Allied Telesis 6870 is a robust Layer 3 Ethernet switch designed for high-performance networking in enterprise environments. Incorporating advanced features and technologies, it serves as a vital component in managing complex network infrastructures, ensuring seamless connectivity, reliability, and enhanced performance.

One of the standout characteristics of the 6870 is its support for a high number of Gigabit Ethernet ports. With multiple SFP and SFP+ ports, the switch allows for flexibility in connecting various devices, while also facilitating the use of different physical media. This capability is crucial for organizations that demand versatile connection options, particularly when managing diverse networking equipment.

The switch is equipped with advanced Layer 3 routing capabilities, allowing it to perform IP routing functions in addition to standard Ethernet switching. Suitable for traffic management, the switch supports protocols such as OSPF, RIP, and static routing, enabling efficient and intelligent path selection in larger networks. This functionality is essential for optimizing bandwidth usage and maintaining an efficient data flow throughout the network.

Another highlight of the Allied Telesis 6870 is its support for VLANs (Virtual Local Area Networks). VLANs enable network segmentation, improving security and performance by isolating different segments of traffic. This capability is further enhanced by the switch's support for advanced features like Ingress/Egress Rate Limiting and Quality of Service (QoS). These features allow network administrators to prioritize critical applications and ensure that bandwidth is allocated effectively.

The switch also incorporates the innovative Allied Telesis Autonomous Management Framework (AMF), which simplifies device management and network configuration. With AMF, administrators can manage multiple switches as a single logical entity, reducing operational complexity and minimizing downtime. This technology supports zero-touch provisioning, enabling rapid deployment and configuration of network devices.

Security is another key aspect of the 6870, with features such as Access Control Lists (ACLs) and IEEE 802.1X port-based authentication. These measures help protect the network from unauthorized access and ensure that only authenticated devices can connect to the network.

In summary, the Allied Telesis 6870 is a versatile and powerful switch that meets the demands of modern enterprise networks. With its comprehensive feature set, including high-performance routing, VLAN support, and advanced management capabilities, it offers a reliable solution for organizations seeking to optimize their network infrastructure. Whether for deploying new services or managing existing traffic, the 6870 stands out as a formidable choice for network administrators.