
CONTROL PANEL
5
4
3
OFF | ON |
2 | 1 |
|
1.On / Off Switch: The On / Off (or Power) Switch is located on the lower
BEFORE moving the On / Off Switch to the On (I) position, make sure the marker on the Variable Speed Dial is pointed at the Stop Symbol (
) at the top of the dial.
After plugging in the unit, move the On / Off Switch to the On position to ready the machine for blending. Move the On / Off Switch to the Off position at night and whenever the machine will be left unattended.
If the On / Off switch is moved to the Off position to stop a program mid- cycle, wait 30 seconds for power to recycle and the timer to reset before moving the On / Off switch to the On position.
When the Pulse, Start / Stop, and Program Symbols brighten, the On / Off Switch is in the On position and power is flowing.
2.Start (
) / Stop (
) Switch: After the marker on the Variable Speed Dial is rotated off of the Stop Symbol ( ) to either Variable Speed 1 or a Program setting, press the Start / Stop Switch to start the machine and initiate
the blending process. Pressing the Start / Stop Switch again will stop the blending process.
Programs can be interrupted by pushing down the Start / Stop switch at any time. If reactivated by pushing down the Start / Stop switch, the program will start at the beginning.
11