1.3INSTALLATION

Although the cooker is easy to install and set up, it is STRONGLY recommended that this installation be done by qualified professionals. The professionals that install the new cooker will know the local building codes and ensure that the installation is safe.

NOTICE

Proper connection to electric, water, and drainage services is essential for safe, efficient, and trouble free operation of the Pasta Perfect cooker.

1.3.1Installation Clearances

The cooker needs clearance around it for proper operation. Adequate clearances allow for proper burner operation and servicing. The clearances shown below are for cooker installation in both combustible and noncombustible enclosures.

 

Combustible

Non-Combustible

 

Construction

Construction

Back

6"

0"

Sides

6"

0"

Floor

6"

6"

1.3.2Plumbing Connections

The plumbing installation must be done by a licensed plumber and must comply with local and national codes.

1.3.2.1Water Inlet Connections (Pasta Perfect units) - The rinsing/holding unit is equipped with a faucet type fill system. Make water connections to the faucets through the rear access panel of rear tank riser.

NOTICE

If cold water only is used to fill the cooker, it will require at least twenty (60) minutes to bring the water up to cooking temperature.

1.3.2.2Drainage Connections - Both the cooking/warming section and the rinsing/holding section are equipped with drainage connections. The main drainage connection is located at the front bottom point of the cooker and is equipped with a 1-1/4" stainless steel valve. The overflow drain is located underneath the front deck of the cooker. The overflow hose is connected at the factory and is ready for installation.

1-3

Image 11
Contents Installation, Operation, and Maintenance Manual Page For Your Safety Safety Safety Safety Safety Safety Table of Contents Thermostat Calibration List of Tables Page Inspecting Your NEW Cooker General Information and InstallationBasket Lift Access Assembly and Leveling1 Leg/Caster Installation and Adjustment Plumbing Connections InstallationInstallation Clearances Electrical Connection Ventilation and Fire Fighting System Inspection Initial AdjustmentsFilling the Pasta Cooker Initial CleaningVisual Checks High Temperature Limit Switch Cooking Operating InstructionsFilling the Cooker Cooker START-UPCooker Shutdown Electric Power FailureDaily Cleaning Weekly Cleaning Page Checking and Replacing Fuses Owner Maintenance and AdjustmentsThermostat Calibration Basket Lift Lubrication MaintenanceOperator Troubleshooting Page