1.3INSTALLATION
Although the cooker is easy to install and set up, it is STRONGLY recommended that this installation be done by qualified professionals. The professionals that install the new cooker will know the local building codes and ensure that the installation is safe.
NOTICE
Proper connection to electric, water, and drainage services is essential for safe, efficient, and trouble free operation of the Pasta Perfect cooker.
1.3.1Installation Clearances
The cooker needs clearance around it for proper operation. Adequate clearances allow for proper burner operation and servicing. The clearances shown below are for cooker installation in both combustible and noncombustible enclosures.
| Combustible | |
| Construction | Construction |
Back | 6" | 0" |
Sides | 6" | 0" |
Floor | 6" | 6" |
1.3.2Plumbing Connections
The plumbing installation must be done by a licensed plumber and must comply with local and national codes.
1.3.2.1Water Inlet Connections (Pasta Perfect units) - The rinsing/holding unit is equipped with a faucet type fill system. Make water connections to the faucets through the rear access panel of rear tank riser.
NOTICE
If cold water only is used to fill the cooker, it will require at least twenty (60) minutes to bring the water up to cooking temperature.
1.3.2.2Drainage Connections - Both the cooking/warming section and the rinsing/holding section are equipped with drainage connections. The main drainage connection is located at the front bottom point of the cooker and is equipped with a