Pitco Frialator PPE14-L, and RSE14 manual Visual Checks, Filling the Pasta Cooker, Initial Cleaning

Page 15

1.4.1Visual Checks

Before filling and adjusting the cooker, perform the following visual checks:

a.After the cooker is in its permanent location, lock the casters (if used), and ensure the cooker is level. Any additional leveling that is necessary can be performed as described in section 1.2.

b.Check the hi-limit bulb, located in the cooker tank, to ensure that the mounting screws are tight. Look down inside the cooker tank toward the rear to see the probe.

1.4.2Filling the Pasta Cooker

The Pasta Perfect cooker is equipped with a faucet fill water system. To fill the cooker with water, swing the faucet over the tank to be filled and open the faucet. Allow the tank to fill until the desired level is reached. During normal operation the water will boil away. Replace water as needed to keep water at the full level. Individual cookers must be manually filled.

NOTICE

If cold water is used to fill the cooker, it will take at least twenty (60) minutes for the cooker to reach operating temperature.

1.4.3 Initial Cleaning

WARNING

The tank must be filled to the minimum fill line before the cooker is turned on.

WARNING

The power supply must be disconnected before servicing or cleaning the appliance.

When the cooker is shipped, many of its parts are covered with a thin coat of shortening for protection. Before the cooker is ready for use, it must be cleaned to remove the oil coating and any foreign matter that may have accumulated during storage and shipment. Perform the cleaning as described below.

NOTICE

This is the first time the cooker will be turned on since leaving the factory. Be watchful for any signs of trouble or unusual activity. When a new piece of equipment is energized, unusual odors may be apparent as new components heat up. This is normal. If odors persist or if excessive smoke is seen, turn the power to the cooker OFF at the facility service panel. Have a qualified technician inspect the cooker for the cause.

1-7

Image 15
Contents Installation, Operation, and Maintenance Manual Page For Your Safety Safety Safety Safety Safety Safety Table of Contents Thermostat Calibration List of Tables Page Inspecting Your NEW Cooker General Information and InstallationAssembly and Leveling 1 Leg/Caster Installation and AdjustmentBasket Lift Access Installation Installation ClearancesPlumbing Connections Electrical Connection Ventilation and Fire Fighting System Inspection Initial AdjustmentsInitial Cleaning Visual ChecksFilling the Pasta Cooker High Temperature Limit Switch Cooking Operating InstructionsFilling the Cooker Cooker START-UPElectric Power Failure Daily CleaningCooker Shutdown Weekly Cleaning Page Owner Maintenance and Adjustments Thermostat CalibrationChecking and Replacing Fuses Basket Lift Lubrication MaintenanceOperator Troubleshooting Page