Reorder part no.
Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure | Description | Qty. | Use |
|
|
|
|
1. | No parts required | – | Unfold the handle. |
|
|
| |
| Discharge chute | 1 |
|
2. | Chute handle | 1 | Install the discharge chute. |
Phillips head screws | 3 | ||
Washers | 3 |
| |
|
| ||
| Locknuts | 3 |
|
1. Unfolding the Handle
Procedure
1. Cut the plastic tie that secures the control cable to the handle.
Note: Hold the cable taut to ensure that it stays connected at the bottom.
2. Loosen the knobs, pull out the handle bolts, and rotate the upper handle to the operating position (Figure 3).
Figure 3
5