McCulloch ZM3016BF/966564001 manual Manual Transport

Page 32

operation

Manual Transport

When pushing or pulling the mower, be sure to engage the EZT Hydrogear bypass linkages. The EZT bypass linkages are located on the rear of the frame, below the rear engine guard.

Raise the deck into the highest cutting position.

Pull the EZT bypass linkages out and into the slots. Release linkages to hold in the bypass position.

Release park brake.

To reengage the EZT’s to drive, reverse the above procedure.

8050-018

Set bypass linkages into slots on both sides

32

Image 32
Contents Operator Manual Page Contents Page Introduction Good Service Manufacturing NumberSymbols and decals Remove key before General Operation SafetySafety Instructions Never take passengers Personal Safety Equipment Slope OperationChildren Safe Handling of Gasoline General Maintenance Risk of sparking Transport Spark ArrestorControls Control LocationsSteering Control Levers Throttle Control Ignition SwitchParking Brake Choke Control RefuelingFuel Shut Off Valve Mower Deck Lifting LeverTracking Always use the high position F to transportManual Transport Seat Adjustment LeverBlade Control Lever Training SteeringBefore Starting Starting the EnginePlace controls in neutral position Open the fuel valve Jumper cables To remove cables, reverse orderRunning Operating on Hills Mowing Tips Stopping the Engine Manual Transport Maintenance Maintenance ScheduleEvery 50 hours Always use protective glasses when handling the battery BatteryTo clean battery and terminals Safety System Tire PressuresTo replace deck belt BeltsDeck Belt EZT Belt Cutting BladesAdjusting the Mower Deck Leveling DeckCleaning Removal and installation of caster wheelUse protective glasses when cleaning and washing Caster WheelsLubrication GeneralFront Wheel Mount Front Wheel BearingsEngine Lubrication Steering Control ShaftsTroubleshooting Problem CauseTroubleshooting Service Winter StorageSchematic Standard Hardware Technical DataTorque Specifications Transmission ZM3016 BFEngine Overall dimensions RZ3019 BFEquipment ProductivityUSA Requirements CE RequirementsService Journal Delivery ServiceHour Service Perform the 25-hour service At Least Once Each Year Page 115 349327R1 03/19/10