Woodstock M1044 manual Foot Pedal, Front Extension Arms

Page 12

M1044 52" Foot Shear

SET UP

Foot Pedal

You will need the help of an assistant for this step.

To install the foot pedal as shown in Figure 5, do these steps:

1.Loosen the set screws that hold the hinge pins in place and slide them outward.

2.With the help of an assistant, position the foot pedal pivot over the hinge pin hole and insert the hinge pin.

3.Tighten the set screws to hold the hinge pin in posi- tion.

4.Link the two swivel bottoms through the side arms of the foot pedal with the supplied bolts and tighten in position.

5.When complete, the finished assembly should look like Figure 5.

Swivel Bottom

OFF Button

Hinge Pin

Pedal Pivot

Main Power

Switch

Set Screw

Figure 5. Foot pedal assembly.

Front Extension Arms

To install the front extension arms as shown in Figure 6, do these steps:

1.Loosen the 19mm bolts on the front of the table.

2.Place the front extension arms over the bolt and behind the special washers.

3.Line up the channel of the front extension arm with the channel on the table.

4.Make sure the ground surface on the front extension arm is flush with the top of the table surface.

5.Tighten the bolts and check to make sure your align- ments are still intact. If they are not, readjust.

6.When complete, the finished assembly should look like Figure 6.

-10-

Front Extension Arm Figure 6. Front extension arm installed.

Image 12
Contents Foot Shear Page Contents Specifications IntroductionWoodstock Technical Support About Your New 52 Foot ShearM1044 Controls and Features Safety Standard Safety InstructionsAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety Instructions for Foot Shears SET UP UnpackingInventory Machine Placement Cleaning Machine Lifting Shear Mounting to Shop FloorTo install the foot pedal as shown in , do these steps Foot PedalFront Extension Arms Pressure Plate Adjustment To adjust the pressure plate, do these stepsRear Extension Arms Blade Adjustment To perform the blade set up, do these stepsAdjusting Blade Bow Finger GuardOperations GeneralStops & Guides Shearing Tips 16 GA 18 GA 20 GAMaintenance Gib AdjustmentBlade Care Return Spring TensionService TroubleshootingM1044 52 Foot Shear Parts List PART# DescriptionWarranty Warranty Registration CommentsBOX BELLINGHAM, WA