Multiquip manual MQ GA-2.9R Preparation for Long -TERM Storage, Generator Storage

Page 25

MQ GA-2.9R — PREPARATION FOR LONG -TERM STORAGE

Generator Storage

For storage of the generating set for over 30 days, the following is required:

Drain the fuel tank completely, or add STA-BIL to the fuel.

Run the engine until the gasoline in the carburetor is completely consumed.

Completely drain the oil from the crankcase and refill with fresh oil.

Remove the spark plug, pour 2 or 3 cc of SAE 30 oil into the cylinder and crank slowly to distribute the oil.

Slowly rotate the engine a few times with the starter Rope and install a new plug.

Pull out the starter rope slowly and stop at the compression point.

Clean all external parts of the generating set with a cloth.

Cover the generating set and store in a clean, dry place.

MQ GA-2.9R A.C. GENERATOR — OPERATION & PARTS MANUAL — REV. #0 (10/28/04) — PAGE 25

Image 25
Contents Model GA-2.9R Page Heres HOW to GET Help Table of Contents When ordering parts Please supply the following information Parts Ordering ProceduresDimensions MQ GA-2.9R- DimensionsEffects of Altitude and Heat SpecificationsBurn Hazards MQ GA-2.9R- Safety Message Alert SymbolsRespiratory Hazards Rotating Parts Hazards Equipment DamageRead this manual MQ GA-2.9R- Rules for Safe OperationMQ GA-2.9R Rules for Safe Operation Emergencies MQ GA-2.9R Rules for Safe OperationOperation and Safety Decals Machine Safety DecalsMQ GA-2.9R Familarization MQ GA-2.9R General InformationControl Panel Excitation SystemMQ GA-2.9R- Load Application Single Phase LoadExtension Cables Generator Controls and Components MQ GA-2.9R Controls and IndicatorsPlaced in the OFF position Generator Refueling MQ GA-2.9R Generator RefuelingOutdoor Installation MQ GA-2.9R InstallationIndoor Installation MountingConnecting the Ground MQ GA-2.9R InstallationMQ GA-2.9R- PRE-INSPECTION General Inspection Prior to Operation Ground Power ToolsExtension Cable Main Circuit BreakerBefore Starting MQ GA-2.9R PRE-INSPECTION EngineEngine Oil Check Fuel CheckBefore Starting the Engine MQ GA-2.9R Initial START-UP EngineStopping The Engine MQ GA-2.9R- Initial START-UP ENGINE/OPERATIONGenerator Storage MQ GA-2.9R Preparation for Long -TERM StorageEngine Maintenance Schedule MQ GA-2.9R Maintenance EngineCleaning the Fuel Strainer MQ GA-2.9R Maintenance EngineMaintenance Generator/Engine Wiring Diagram MQ GA-2.9R -WIRING DiagramEngine Troubleshooting MQ GA-2.9R -TROUBLESHOOTING EngineWhite MQ GA-2.9R -TROUBLESHOOTING EngineMQ GA-2.9R -TROUBLESHOOTING Generator MQ GA-2.9R Explanation of Code in Remarks Column How to read the marks and remarks used in this parts bookItems Found In the Items Number Column To 3 Units MQ GA-2.9R Suggested Spare PartsMQ GA-2.9R Name Plate and Decals Part Name QTY Remarks MQ GA-2.9R Name Plate and DecalsMQ GA-2.9R Generator Assy SET BOLT, Rotor MQ GA-2.9R Control BOX Assy Control BOX MQ GA-2.9R Pipe Frame Assy Part Name Robin EX170D20210 Crankcase Assy Robin EX170D20210- Crankcase Assy Robin EX170D20210 Crankshaft and Piston Assy Crankshaft Assy Robin EX170D20210 Governor Assy Part Name QTY. Remarks Robin EX170D20210 Intake and Exhaust Assy PIN, CAM Shaft Robin EX170D20210 AIR Cleaner Assy Robin EX170D20210 AIR Cleaner Assy Robin EX170D20210 Cooling Starting Assy Blower Housing CP Robin EX170D20210 -CARBURETOR Assy Robin EX170D20210 Carburetor Assy Robin EX170D20210 Flywheel Assy Part Name QTY Robin EX170D20210 Electric Device Assy OIL Sensor CP Freightpolicy Terms and Conditions of Sale PartsPage Your Local Dealer is