Figure 19
8) Place the TOP PANEL
1>. The side with the CONTROL BOX is the up side.
2> The edge nearest to the CONTROL BOX is the front of TOP PANEL. (see figure 20)
Be careful of the wires in the SIDE PANELS before you set the TOP PANEL down. Feed these wires through the holes in the TOP PANEL. Feed the control cable and CD connectors down from the TOP PANEL through the
3> Be careful not to force the TOP PANEL in to place without making sure that the wires are properly fed through the holes. (see figure 21)
4> When all wires are set, lower the TOP PANEL into place. (see figure 22)
Figure 22
9) CONTROL BOX
The control box is the control center of the sauna room and is installed on the TOP PANEL, input/output connection as below. (See Figure 3)