Grandstream Networks 005261-0 owner manual Operating Unit with Manual Transfer Switch

Page 15

Stationary Emergency Generator

Operation

STATIONARY EMERGENCY GENERATOR CONTROL AND OPERATION

Refer to the appropriate control panel operator’s manual for this unit.

OPERATING UNIT WITH MANUAL TRANSFER SWITCH

If the Stationary Emergency Generator was installed in conjunction with a transfer switch capable of man- ual operation only, the following procedure applies. A manually operated transfer switch is one that will not provide automatic start-up and does not include an intelligence circuit.

Do not crank the engine continuously for longer than 30 seconds, or the heat may

damage the starter motor.

Let engine stabilize and warm up.

Check all applicable instrument and gauge read- ings. When certain that all readings are correct, move the transfer switch manual handle to the STANDBY position, i.e., load circuits supplied by the generator.

Set the generator’s main line circuit breaker to its ON (or CLOSED) position.

Load circuits are now powered by the generator.

‹ENGINE START-UP AND TRANSFER

For additional information, refer to the applicable control panel manual for this unit, as well as any lit- erature pertaining to the specific transfer switch.

DANGER

The Maintenance Disconnect Switch and the AUTO/OFF/MANUAL switches (if so equipped) must be set properly, or the generator will crank and start as soon as the utility power to the transfer switch is turned off. Refer to applicable control panel and transfer switch manuals for more information.

Do not proceed until certain that utility source voltage is available to the transfer switch and the transfer switch main contacts are set to

UTILITY.

Do not attempt manual operation until all power supplies to the transfer switch have been posi- tively turned off, or extremely dangerous - pos- sibly lethal - electrical shock will result.

Transfer switch enclosure doors should be kept closed and locked. Only authorized personnel should be allowed access to the transfer switch interior. Extremely high and dangerous voltages are present in the transfer switch.

In order to transfer load from the utility source to the generator, follow these directions:

Turn OFF or disconnect the utility power circuit to the transfer switch, using the means provided (such as the utility source main line circuit break- er).

Set the transfer handle to its UTILITY (NORMAL) position with load circuits connected to the utility power supply.

Set the generator’s main line circuit breaker to its OFF (or OPEN) position.

Start the generator.

‹RETRANSFER AND SHUTDOWN

For additional information, refer to the applicable control panel manual for this unit, as well as any lit- erature pertaining to the specific transfer switch.

To transfer the load back to the utility power source and shut down the generator, follow these direc- tions:

Set the generator’s main line circuit breaker to its OFF (or OPEN) position.

Manually move the transfer switch handle to its UTILITY (NORMAL) position, i.e., load circuits connected to the utility.

Turn ON the utility power supply to the transfer switch, using the means provided (such as the util- ity power source main line circuit breaker).

Let the generator run at no-load for a few minutes to stabilize internal temperatures.

Shut down the generator.

OPERATING UNIT WITH AUTOMATIC TRANSFER SWITCH

If the Stationary Emergency Generator has been installed with an automatic transfer switch, such as an RTS, HTS, or GTS-type transfer switch, the engine may be started and stopped automatically or manually.

NOTE:

Refer to the applicable manual for your trans- fer switch and to “Transfer Switch Start Signal Connections”. In addition, please note the dangers under “Engine Start-up and Transfer.”

9-1

09/08 A .Rev Oper001

Image 15
Contents Model Standby Generator Sets Table of Contents Introduction ‹ Operation and Maintenance‹ HOW to Obtain Service Authorized Service Dealer Location Warning   Electrical Hazards  ‹ Data Label Identification RecordEquipment Description Engine OIL RecommendationsCoolant Recommendations Engine Protective Devices ‹ Natural GAS Fuel System Fuel System‹ Fuel Requirements ‹ LP Liquid Fuel SystemSpecifications ‹ Cold Weather KIT ‹ Reconfiguring the Fuel SystemAlternator AC Lead Connections Alternator Power Winding Connections‹ FOUR-LEAD, SINGLE-PHASE Stator ‹ 3-PHASE AlternatorsInstallation Preparation Before START-UPInitial Inspection for QT Genset Startup START-UP Checklist ‹ Preparation for START-UP‹ START-UP Inspection Operating Unit with Manual Transfer Switch ‹ Engine START-UP and Transfer‹ Retransfer and Shutdown Checking Fluid Levels Cooling SystemMaintenance Owner Operator can Perform ‹ Changing the Engine AIR Cleaner ‹ Coolant Change ‹ Changing Engine OIL‹ Spark Plugs ‹ Battery Maintenance Miscellaneous Maintenance‹ Cleaning the Generator ‹ BatteryService Schedule Maintenance Level Level5 Tasks 11-4 Problem Cause Correction Troubleshooting GuideStationary Emergency Generator Page PAN CB Conn BOX Page UL Circuit Breaker QJ-2P Page Assy STR 390 25GD3 CPL Page Components Included in 0F9696E Page Weldment Frame 2.4L C2 Page Battery Tray C1 CPL Page Engine 2.4L G1 Page Weldment Radiator Support 2.4L Page Gasket Bosch 32 Page Flange Fuel Inlet Page Rear Wrap C2 CPL Page Bracket Muffler Page Page Page Page Page Page Page Page Page Page Page Page Page C2 Units Stationary Emergency Generator Warranty