Grandstream Networks 005261-0 owner manual Maintenance Level

Page 21

Stationary Emergency Generator

Service Schedule

Maintenance

Level 1

 

Level 2

 

Level 3

 

Level 4

 

Level 5

 

Tasks

Recom-

Task

Required

Task

Required

Task

 

Task

Required

Task

 

mended

Comp.

to be done

Comp.

to be done

Comp.

Required

Comp.

to be done

Comp.

 

to be done

(Date-

3 months/

(Date-

Semi-

(Date-

to be done

(Date-

Bi-

(Date-

 

monthly/

Initials)

Break-in

Initials)

annually/

Initials)

Annually/

Initials)

annually/

Initials)

 

10 hrs.

 

30 hrs.

 

50 hrs.

 

100 hrs.

 

250 hrs.

 

1.Disable the unit from operating

per the first page warning.

2.Check the engine

oil level. Adjust as necessary.

3.Check the engine coolant level. Adjust as necessary.

4.Check the engine coolant thermal

protection level. Correct as necessary.

5.Check the natural gas delivery

system for leaks and correct pressure on gas engine driven units. Tighten connections as necessary.

6.Check the air inlets and outlets for debris. Clean as necessary.

7.Check the battery electrolyte level and specific gravity if accessible. Adjust as necessary.

8.Check the battery

posts, cables, and charger for loose connections, corrosion, and proper operation. Correct as necessary.

9.Check the unit wiring for loose connections, corrosion, and damage. Correct as necessary.

02/09 E .Rev SrvSchd001

11-2

Image 21
Contents Model Standby Generator Sets Table of Contents ‹ HOW to Obtain Service ‹ Operation and MaintenanceAuthorized Service Dealer Location Introduction Warning   Electrical Hazards  ‹ Data Label Identification RecordEquipment Description Engine OIL RecommendationsCoolant Recommendations Engine Protective Devices ‹ Fuel Requirements Fuel System‹ LP Liquid Fuel System ‹ Natural GAS Fuel SystemSpecifications ‹ Cold Weather KIT ‹ Reconfiguring the Fuel System‹ FOUR-LEAD, SINGLE-PHASE Stator Alternator Power Winding Connections‹ 3-PHASE Alternators Alternator AC Lead ConnectionsInstallation Preparation Before START-UPInitial Inspection for QT Genset Startup START-UP Checklist ‹ Preparation for START-UP‹ START-UP Inspection Operating Unit with Manual Transfer Switch ‹ Engine START-UP and Transfer‹ Retransfer and Shutdown Checking Fluid Levels Cooling SystemMaintenance Owner Operator can Perform ‹ Changing the Engine AIR Cleaner ‹ Coolant Change ‹ Changing Engine OIL‹ Spark Plugs ‹ Cleaning the Generator Miscellaneous Maintenance‹ Battery ‹ Battery MaintenanceService Schedule Maintenance Level Level5 Tasks 11-4 Problem Cause Correction Troubleshooting GuideStationary Emergency Generator Page PAN CB Conn BOX Page UL Circuit Breaker QJ-2P Page Assy STR 390 25GD3 CPL Page Components Included in 0F9696E Page Weldment Frame 2.4L C2 Page Battery Tray C1 CPL Page Engine 2.4L G1 Page Weldment Radiator Support 2.4L Page Gasket Bosch 32 Page Flange Fuel Inlet Page Rear Wrap C2 CPL Page Bracket Muffler Page Page Page Page Page Page Page Page Page Page Page Page Page C2 Units Stationary Emergency Generator Warranty