Grandstream Networks 005261-0 owner manual Level5 Tasks

Page 22

Stationary Emergency Generator

Service Schedule

Maintenance

Level 1

 

Level 2

 

Level 3

 

Level 4

 

Level5

 

Tasks

Recom-

Task

Required

Task

Required

Task

 

Task

Required

Task

 

mended

Comp.

to be done

Comp.

to be done

Comp.

Required

Comp.

to be done

Comp.

 

to be done

(Date-

3 months/

(Date-

Semi-

(Date-

to be done

(Date-

Bi-

(Date-

 

monthly/

Initials)

Break-in

Initials)

annually/

Initials)

Annually/

Initials)

annually/

Initials)

 

10 hrs.

 

30 hrs.

 

50 hrs.

 

100 hrs.

 

250 hrs.

 

10.Check the engine accessory drive belts and fan coupling device if equipped for

correct tension, wear, weather cracking, and damage. Replace as necessary.

11.Check the engine valve clearance/ lash. Adjust as necessary.**

12.Visually inspect the unit looking for leaks, wear or damage, loose connections or components, and corrosion. Correct as necessary.

13.Test the engine and transfer switch safety devices. Correct and/or adjust as necessary.

14.Initiate an automatic start and transfer of the unit to site load and exercise

it for at least 1 hour looking for leaks, loose connections or components, and abnormal operating conditions. Correct as necessary.

15.Replace the engine accessory drive belts.

16.Check gearbox

oil level (if equipped).

17. Change gearbox oil (if equipped).

** Not required for engines equipped with hydraulic lifters. See the "Specification" section for lifter type.

11-3

02/09 E .Rev SrvSchd001

Image 22
Contents Model Standby Generator Sets Table of Contents Authorized Service Dealer Location ‹ Operation and Maintenance‹ HOW to Obtain Service Introduction Warning   Electrical Hazards  Identification Record ‹ Data LabelEngine OIL Recommendations Equipment DescriptionCoolant Recommendations Engine Protective Devices ‹ LP Liquid Fuel System Fuel System‹ Fuel Requirements ‹ Natural GAS Fuel SystemSpecifications ‹ Reconfiguring the Fuel System ‹ Cold Weather KIT‹ 3-PHASE Alternators Alternator Power Winding Connections‹ FOUR-LEAD, SINGLE-PHASE Stator Alternator AC Lead ConnectionsPreparation Before START-UP InstallationInitial Inspection for QT Genset Startup ‹ Preparation for START-UP START-UP Checklist‹ START-UP Inspection ‹ Engine START-UP and Transfer Operating Unit with Manual Transfer Switch‹ Retransfer and Shutdown Cooling System Checking Fluid LevelsMaintenance Owner Operator can Perform ‹ Changing Engine OIL ‹ Changing the Engine AIR Cleaner ‹ Coolant Change‹ Spark Plugs ‹ Battery Miscellaneous Maintenance‹ Cleaning the Generator ‹ Battery MaintenanceService Schedule Maintenance Level Level5 Tasks 11-4 Troubleshooting Guide Problem Cause CorrectionStationary Emergency Generator Page PAN CB Conn BOX Page UL Circuit Breaker QJ-2P Page Assy STR 390 25GD3 CPL Page Components Included in 0F9696E Page Weldment Frame 2.4L C2 Page Battery Tray C1 CPL Page Engine 2.4L G1 Page Weldment Radiator Support 2.4L Page Gasket Bosch 32 Page Flange Fuel Inlet Page Rear Wrap C2 CPL Page Bracket Muffler Page Page Page Page Page Page Page Page Page Page Page Page Page C2 Units Stationary Emergency Generator Warranty