Echo PB-250LN specifications Starting Cold Engine, Mixing Instructions

Page 15

PB-250LN

OPERATION

 

 

Mixing Instructions

1.Fill an approved fuel container with half of the required amount of gasoline.

2.Add the proper amount of 2-stroke oil to gasoline.

3.Close container and shake to mix oil with gasoline.

4.Add remaining gasoline, close fuel container, and remix.

Spilled fuel is a leading cause of hydrocarbon emissions. Some states may require the use of automatic fuel shut-off containers to reduce fuel spillage.

After use

DO NOT store a unit with fuel in its tank. Leaks can occur. Return unused fuel to an approved fuel storage container.

Storage - Fuel storage laws vary by locality. Contact your local government for the laws affecting your area. As a precaution, store fuel in an approved, airtight container. Store in a well-ventilated, unoccupied building, away from sparks and flames.

Stored fuel ages. Do not mix more fuel than you expect to use in thirty (30) days, ninety (90) days when a fuel stabilizer is added.

Stored two-stroke fuel may separate. ALWAYS shake fuel container thoroughly before each use.

Starting Cold Engine

1.Stop Switch

Move stop switch (A) away from the STOP position.

2.Throttle Position Lever

Move throttle position lever (B) midway between idle and full throttle positions.

3.Choke

Move choke (C) to Cold Start ( ) (closed) position.

A

B

X7501183303

15

© 3/2013 ECHO Inc.

Image 15
Contents Burn Hazard Operator’s ManualTable of Contents Servicing Information IntroductionSafety Manual Safety Symbols and Important InformationInternational Symbols Personal Condition and Safety Equipment Repetitive Stress Injuries Vibration and ColdEquipment Product Emission Durability Emission Compliance Period EPA 2010 and Later and/or C.A.R.B. TierDescription Safety Decal Lists important safety precautions Contents Install Blower Pipes AssemblyRemove Blower Pipes OperationFuel Fuel RequirementsHandling Fuel Mixing Instructions Starting Cold EnginePurge Bulb Starting Warm EngineOperating Blower Stopping EngineRead the Safety Section carefully Maintenance Maintenance IntervalsSkill Levels Fuel Filter Air FilterCleaning Grill Spark PlugCooling System Spark Arrestor Screen Cleaning Cylinder FinsExhaust Port Cleaning Exhaust SystemCarburetor Adjustment Engine Break-InHigh Altitude Operation Start engine, run at idle for one minute Engine Problem Troubleshooting Chart TroubleshootingLong Term Storage Over 30 Days StorageModel SpecificationsOWNER’S Responsibility Warranty StatementsWarranty Statements PB-250LN PB-250LN