Camerons Products MSC-2769-SLD owner manual Main frame layout

Page 15

ASSEMBLY INSTRUCTION

Place the playground equipment on level ground, not less than 6 ft (1.8 m) from any structure or obstruction such as a fence, garage, house, overhanging branches, laundry lines, or electrical wires.

Do not install the playground equipment over concrete, asphalt, packed earth, or any other hard surface. A fall onto a hard surface can result in serious injury to the user.

TIGHTENING NUTS & BOLTS

Do not over-tighten the nuts and bolts when you are assembling your playground equipment. This will allow for some possible adjustments and ease of installation.

Once you have finsihed the assembly of the playground assembly, go back over all of the nuts and bolts and properly tighten all of them before using the playground equipment.

Main frame layout

A2

A5 J/// /

A1///

\ ',,

A5 ',\,

' ',,

A4

\ \, \ ,,

\\

', \

1 4

Image 15
Contents MSC-2769-SLD Cameron General Instruction Waing Tightening Nuts & Bolts Consumer Information Sheet Hardware Actual Size but for Reference only Bracket used for glide ride assembly Hardware used for slide assembly Tools needed for assembly Hardware used for main frame assembly Parts used for swing seats assembly Parts used for glide ride assembly BOLT1/4,34 Parts used for slide assembly Main frame layout Step Step Step N10 SecureusingN6 and N9. Seediagram for sequence Attach M4 to L3 Secure using N1,N10 and N8 Z1 Z4 Secure using Z2, Z6, Z7, and Z5 as shown Optional Anchors Frame LEG Manufacturers Limited Warranty