Camerons Products MSC-2769-SLD owner manual Optional Anchors

Page 24

OPTIONAL ANCHORS

(NOTE: ANCHORS ARE NOT INCLUDED, SOLD SEPARATELY)

By anchoring your set with Ground Anchors, you will be able to move your gym set at a future date. Either method is suitable for hard soil (clay, etc.). If your soil is soft (sand, etc.), the corkscrew method is recommended. If you wish to permanently secure your gym set, either type of anchor may set in concrete. Ensure equipment is firmly anchored (cementing is usually recommended). When equipment is cemented, do not bury the legs more than three inches below the ground surface. This will ensure sufficient space remains under the swinging plays. Be certain that all anchoring devices (including concrete) are placed below the level of the playing surface or below ground level to prevent tripping.

Corkscrew Anchors is not included

Be sure the swing set is located on level ground

Turn the corkscrew anchor into the ground until only the hooked end is above the ground next to the leg.

Insert the hooked end into the bottom opening of the leg. Ensure that the hooked end is secure in the leg opening.

4

%

4

NOTE: ANCHORING, ANCHOR SOLD SEPRATELY

Anchoring in concrete should be done for this swing set if it is not possible, you may purchase anchors at t-866-884-0535.

If the swing set is set up on grounds with sandy soil condition, it must be anchored with concrete looting( concrete not included) Be sure the swing set is located in level ground

Dig holes around swing leg tube as shown below in drawing. As you dig down and create a cylindrical hole, you should use shovel to carve out the lower part of the hole, to create a larger diameter hole bottom

Place 2 inches brick or gravel bed as shown in drawing below

Use about 45tb of concrete per leg

Cover concrete with dirt and protective surface material

Allow about 6-7 days for concrete to dry properly

23

Image 24
Contents MSC-2769-SLD Cameron General Instruction Waing Tightening Nuts & Bolts Consumer Information Sheet Hardware Actual Size but for Reference only Bracket used for glide ride assembly Hardware used for slide assembly Tools needed for assembly Hardware used for main frame assembly Parts used for swing seats assembly Parts used for glide ride assembly BOLT1/4,34 Parts used for slide assembly Main frame layout Step Step Step N10 SecureusingN6 and N9. Seediagram for sequence Attach M4 to L3 Secure using N1,N10 and N8 Z1 Z4 Secure using Z2, Z6, Z7, and Z5 as shown Optional Anchors Frame LEG Manufacturers Limited Warranty