Bush Hog PT5 manual Hydraulics, Front End Weight, Power Take Off PTO

Page 39
(S3PT-16)

OPERATION

3.6 Hydraulics

The PT5 uses the tractor’s open center hydraulics remote outlets; optimum mower performance will require 3.8 to 5.6 gallons per minute. Adjust tractor RPM to achieve this hydraulic flow rate (Higher flow rates may cause damage to the cutter’s drive mechanism).

Hydraulic controls shall be provided for boom lift, dipper, and sickle bar tilt for full operator control. The mower’s hydraulic system shall be protected from overload by an automatic relief valve.

3.7 Front End Weight

A minimum of 20% total tractor weight must be maintained on the tractor front end at all times. Front end weight is critical to maintain steering control and to prevent the tractor from rearing up while driving. If the front end is too light, add weight until a minimum of 20% total weight is reached on the front tires. Front weights and weight carriers can be purchased through an authorized tractor dealership. OPS-U- 0005

3.8 Power Take Off (PTO)

Depending on the unit, the mower is designed to operate at a PTO speed of 540 or 1000 RPM. Most tractors operate at either 540, or a combination of 540 and 1000 RPM PTO speeds. The operating speed of the mower and tractor can be determined by the number of splines on the driveline yoke and PTO output shaft. Those operating at 540 RPM will have a 6-spline shaft and those operating at 1000 RPM will have a 21-spline shaft or a 1-3/4” 20 spline shaft. Refer to the tractor owner’s manual for instructions to change PTO speeds on models that operate at more than one speed.

If operating an older model tractor where the tractor’s transmission and PTO utilize one master clutch, an over-running clutch must be used between the PTO output shaft and the driveline of the mower. An authorized tractor dealer can provide the over-running clutch and its installation if needed. OPS-U- 0006

DO NOT use a PTO adapter to attach a non-matching Implement driveline to a Tractor PTO. Use of an adapter can double the operating speed of the Implement resulting in excessive vibration, thrown objects, and blade and implement failure. Adapter use will also change the working length of the driveline exposing unshielded driveline areas. Serious bodily injury and/or equipment failure can result from using a PTO adapter. Consult an authorized dealer for assistance if the Implement driveline does not match the Tractor PTO.

(S3PT-14)

Never operate the Tractor and Mower if the Implement input driveline is directly connected to the Tractor transmission. Tractor braking distances can be substantially increased by the momentum of the rotating Mower blades driving the Tractor transmission even though the Tractor clutch has been disengaged. Install an over running clutch between the Tractor PTO and the Mower driveline to prevent this potentially dangerous situation.

PT5 09/10

Operation Section 4-7

© 2010 Alamo Group Inc.

OPERATION

Image 39
Contents PT5 To the Owner/Operator/Dealer Page Bush Hog Division is willing to provide Table of Contents Maintenance Section Safety Section Safety PT5 09/10 Safety Section Safety Safety Safety Safety SGM-06 Stop Mowing if Passersby are Within 300 Feet Unless Wait a minute...Save a life See Your Bush HOG Dealer Decal Location QTY Type Description Decal Description Safety Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Ballast Weight Tractor SelectionAttachment to Tractor Coupling UP Hydraulics Removal from the TractorStorage Page Operation Section Operation Operation Personal Protective Equipment PPE Operator RequirementsTractor Requirements Rops and Seat BeltOperator Thrown Object Protection Tractor Horsepower Tractor Lighting and SMV Emblem3-Point Hitch Front End Weight Power Take Off PTOHydraulics Getting on and OFF the Tractor Boarding the TractorDismounting the Tractor Starting the Tractor Operation PRE-OPERATION Inspection and Service Connecting the Implement to TractorTractor Pre-Operation Inspection/Service Boom Unit Pre-Operation Inspection and Service Frame Assembly OPS-B- 0023G Operation Do not Operate an Unsafe Tractor or Mower Do not Operate an Unsafe Tractor or Implement Machine Controls Operating the ImplementArm Controls Breakaway Unclogging Cutterbar, Checks or AdjustmentsForward Speed Highway WorkingDriving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Driving the Tractor and Boom Operating the Tractor and Implement Operating Speed and Ground Speed Foreign Debris Hazards/Overhead ObstructionsOperating the Attached Head Shutting Down the Implement TRACTOR, BOOM, and Attached Head StorageTransporting the Tractor and Implement Disconnecting the ImplementTransporting on Public Roadways Operation Operation Hauling the Tractor and Implement Troubleshooting Guide Page Maintenance Section Fasteners LubricationCutterbar Adjusting the Knife GuidesSharpening the Knife To Change Seals on Angle, Reach and 40 MM Dia Lift Ram Ram Seal Replacement- General InformationFiltration Maintenance Hydraulic RamsNon Return Valve Control ValveMain Relief Valve Hose ReplacementHydraulic Hoses Replacing Spool O RingsHose Warranty Hose Connections StorageProper Torque Values for Fasteners Maintenance Limited Warranty To the OWNER/OPERATOR/DEALER PT5 Powertrim Sickle BAR Boom Mower