Bush Hog PT5 manual Connecting the Implement to Tractor, PRE-OPERATION Inspection and Service

Page 43
(SG-14)

OPERATION

6. CONNECTING THE IMPLEMENT TO TRACTOR

1.Unbolt the upper halves of the yoke and fit them either side of the tractor’s top hitch bracket with the 3/4” UNF nut and bolt provided. If the tractor has only one top hitch position, the bolt will replace the existing top hitch pin. If more than one location is available mount the yokes through an alternative position as it will make it easier to put the machine on and take it off the tractor.

2.Do not tighten the nut at this stage.

3.Attach the machine to the three point linkage and raise to give 200-250 mm (8”-10”) clearance under the lowest part of the frame.

4.Rebolt the yoke halves together. It may be necessary to raise or lower the machine on the linkage to achieve hole alignment. Adjust the top link until the main frame is vertical.

5.Tighten the nut and bolt securing the upper yoke just enough to eliminate any sideways movement. Do not overtighten and squeeze the top hitch brackets

6.Tighten the check chains/ stabilizer bars.

7.Release its holding chain and position the control valve to suit the tractor and operator. This is achieved by a combination of height adjustments in the mounting bar attachment and by bending the mounting bar itself.

8.Turn the parking leg upside down and pin in position.

Never work under the Implement, the framework, or any lifted component unless the Implement is securely supported or blocked up to prevent sudden or inadvertent falling which could cause serious injury or even death.

Do not let the Blades turn when the Mower Deck is raised for any reason, including clearance or for turning. Raising the Mower deck exposes the Cutting Blades which creates a potentially serious hazard and could cause serious injury or even death from objects thrown from the Blades. (SRM-07)

7. PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair cost can be avoided. OPS-U-0029

PT5 09/10

Operation Section 4-11

© 2010 Alamo Group Inc.

OPERATION

Image 43
Contents PT5 To the Owner/Operator/Dealer Page Bush Hog Division is willing to provide Table of Contents Maintenance Section Safety Section Safety PT5 09/10 Safety Section Safety Safety Safety Safety SGM-06 Stop Mowing if Passersby are Within 300 Feet Unless Wait a minute...Save a life See Your Bush HOG Dealer Decal Location QTY Type Description Decal Description Safety Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Tractor Selection Ballast WeightAttachment to Tractor Removal from the Tractor Coupling UP HydraulicsStorage Page Operation Section Operation Operation Personal Protective Equipment PPE Operator RequirementsRops and Seat Belt Tractor RequirementsOperator Thrown Object Protection Tractor Lighting and SMV Emblem Tractor Horsepower3-Point Hitch Power Take Off PTO Front End WeightHydraulics Boarding the Tractor Getting on and OFF the TractorDismounting the Tractor Starting the Tractor Operation PRE-OPERATION Inspection and Service Connecting the Implement to TractorTractor Pre-Operation Inspection/Service Boom Unit Pre-Operation Inspection and Service Frame Assembly OPS-B- 0023G Operation Do not Operate an Unsafe Tractor or Mower Do not Operate an Unsafe Tractor or Implement Machine Controls Operating the ImplementArm Controls Breakaway Unclogging Cutterbar, Checks or AdjustmentsForward Speed Highway WorkingDriving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Driving the Tractor and Boom Operating the Tractor and Implement Operating Speed and Ground Speed Foreign Debris Hazards/Overhead ObstructionsOperating the Attached Head Shutting Down the Implement TRACTOR, BOOM, and Attached Head StorageTransporting the Tractor and Implement Disconnecting the ImplementTransporting on Public Roadways Operation Operation Hauling the Tractor and Implement Troubleshooting Guide Page Maintenance Section Fasteners LubricationCutterbar Adjusting the Knife GuidesSharpening the Knife To Change Seals on Angle, Reach and 40 MM Dia Lift Ram Ram Seal Replacement- General InformationFiltration Maintenance Hydraulic RamsNon Return Valve Control ValveMain Relief Valve Hose ReplacementHydraulic Hoses Replacing Spool O RingsHose Connections Storage Hose WarrantyProper Torque Values for Fasteners Maintenance Limited Warranty To the OWNER/OPERATOR/DEALER PT5 Powertrim Sickle BAR Boom Mower