Bush Hog PT5 manual Hauling the Tractor and Implement

Page 66

OPERATION

OPERATION

13.2 Hauling the Tractor and Implement

Before transporting a loaded tractor and implement, measure the height and width dimensions and gross weight of the complete loaded unit. Ensure that the load will be in compliance with the legal limits set for the areas that will be traveled through. OPS-U- 0024

Use adequately sized and rated trailers and equipment to transport the tractor and implement. Consult an authorized dealer to determine the proper equipment required. Using adequately sized chains, heavy duty straps, cables and/or binders, securely tie down both the front and rear of the tractor utilizing the proper tie down locations as specified by the tractor manufacturer. OPS-U- 0025

Arrange the chains so that when tightened, the chains are pulling downw ard and agains t themselves. Carefully tighten the securing chains or other fasteners using boomers or binders to apply maximum tension. Use extreme care when attaching and removing the securing devices as the extreme tension involved when released has the potential to inflict serious injury.

While hauling the tractor and implement, make occasional stops to check that the tractor and implement have not moved or shifted and that the securing chains have maintained tension. If during transport a hard braking, sharp turning, or swerving action was performed, stop at the next safe location to inspect the security of the load. OPS-U- 0026

PT5 09/10

Operation Section 4-34

© 2010 Alamo Group Inc.

Image 66
Contents PT5 To the Owner/Operator/Dealer Page Bush Hog Division is willing to provide Table of Contents Maintenance Section Safety Section Safety PT5 09/10 Safety Section Safety Safety Safety Safety SGM-06 Stop Mowing if Passersby are Within 300 Feet Unless Wait a minute...Save a life See Your Bush HOG Dealer Decal Location QTY Type Description Decal Description Safety Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Before Operating this Machine Assembly Section Ballast Weight Tractor SelectionAttachment to Tractor Coupling UP Hydraulics Removal from the TractorStorage Page Operation Section Operation Operation Operator Requirements Personal Protective Equipment PPETractor Requirements Rops and Seat BeltOperator Thrown Object Protection Tractor Horsepower Tractor Lighting and SMV Emblem3-Point Hitch Front End Weight Power Take Off PTOHydraulics Getting on and OFF the Tractor Boarding the TractorDismounting the Tractor Starting the Tractor Operation Connecting the Implement to Tractor PRE-OPERATION Inspection and ServiceTractor Pre-Operation Inspection/Service Boom Unit Pre-Operation Inspection and Service Frame Assembly OPS-B- 0023G Operation Do not Operate an Unsafe Tractor or Mower Do not Operate an Unsafe Tractor or Implement Operating the Implement Machine ControlsArm Controls Highway Working Unclogging Cutterbar, Checks or AdjustmentsForward Speed BreakawayDriving the Tractor and Implement Starting the Tractor Brake and Differential Lock Setting Driving the Tractor and Boom Operating the Tractor and Implement Foreign Debris Hazards/Overhead Obstructions Operating Speed and Ground SpeedOperating the Attached Head TRACTOR, BOOM, and Attached Head Storage Shutting Down the ImplementDisconnecting the Implement Transporting the Tractor and ImplementTransporting on Public Roadways Operation Operation Hauling the Tractor and Implement Troubleshooting Guide Page Maintenance Section Lubrication FastenersAdjusting the Knife Guides CutterbarSharpening the Knife Hydraulic Rams Ram Seal Replacement- General InformationFiltration Maintenance To Change Seals on Angle, Reach and 40 MM Dia Lift RamControl Valve Non Return ValveReplacing Spool O Rings Hose ReplacementHydraulic Hoses Main Relief ValveHose Warranty Hose Connections StorageProper Torque Values for Fasteners Maintenance Limited Warranty To the OWNER/OPERATOR/DEALER PT5 Powertrim Sickle BAR Boom Mower