Alamo 4211 MSL manual Loading LOW Trucks or Spreaders from a Pile

Page 79

OPERATION

LOADING LOW TRUCKS OR SPREADERS FROM A PILE

For faster loading, minimize angle of turn and length of run between pile and spreader. Back grade occasionally with a loaded bucket to keep working surface free of ruts and holes. Also, hold lift control forward so full weight of bucket is scraping ground.

Do not roll bucket over and attempt to backgrade. This type of use can cause severe overloading of bucket cylinders when fully extended, possibly causing bucket cylinder rods to become bent.

4211-4211SS MSL 01/11

Operation Section 4-33

© 2011 Alamo Group Inc.

OPERATION

Image 79
Contents 4211 MSL To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section General Safety Instructions and Practices Safety4211-4211SS MSL 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 Safety Safety 4211-4211SS MSL 01/11 Safety Section SL-33 Safety Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices Safety Concluding Safety Instructions and Practices Storage and Parking Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 4211-4211SS MSL 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Page Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Instructions AssemblyAssembly Proper Rear Ballasting and Wheel Spacing Dismounting Loader Dismounting Loader and Mounting Loader to TractorMounting Loader Attaching Pin on BucketMounting Attachment to Loader Mounting and Dismounting AttachmentAssembling Quick Attach Device Installing Quick Attach Device When Connecting an Attachment to the Loader Quick Hitch Assembly Page Operation Section Operation Standard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Rops and Seat Belt Tractor RequirementsTractor Lighting and SMV Emblem Tractor Ballast Getting On and Off the TractorDismounting the Tractor Boarding the TractorStarting the Tractor Tractor Pre-Operation Inspection/Service Pre-Operation Inspection and ServiceLoader Pre-Operation Inspection and Service Mount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Driving the Tractor and Loader Operating the Tractor and LoaderSG-36 Operation Operation SL-33 Operation Filling the Bucket Operating the LoaderOperation Lifting the Load Carrying the Load Lowering the Bucket Dumping the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Transporting the Tractor and Implement Loader StorageShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Troubleshooting Guide Page Maintenance Section Maintenance 4211-4211SS MSL 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Lift and Bucket Cylinder Disassembly Cylinder ServiceStorage Lift and Bucket Cylinder ReassemblyStore loader with attachment securely attached Proper Torque for Fasteners Maintenance Maintenance Rhino To the OWNER/OPERATOR/DEALER MSL 4211SS MSL Loader