梄苼ッ鷘
梄苼チ | 梄黖 |
梄麭
貚鞢爃麆鞢塜濿㧻
藜 蘂
♦Remove all packing materials from shipping box. Check that all foam and plastic padding is removed.
♦Place Liquid Control Unit on a flat surface.
♦Put a Tank beside Liquid Control Unit and connect a 6mm PU tube between Tank & Liquid Input Adapter
♦Connect 6mm PU tube from Liquid Output Adapter then extend this tube to
four
and
♦Firmly attach the remote control cable to the proper input on the rear of the machine.
♦If you are connecting the machine to a DMX controller or in a daisy chain of DMX controlled devices ensure the various cables are connected to the proper socket on the back of the fog machine.
Operation
5