Exmark Metro HP manual Grease Lubrication Chart, Spray Lubricant Chart

Page 28

b)Remove deck support belt shield to check mower deck drive belt condition.

c)Look under engine deck to check the transmission drive and clutching belt condition.

d)Inspect wheel drive belt conditions

e)Check the wheel drive idler arms to be sure they pivot freely. Disassemble, clean and grease pivot bushings if necessary.

5.1.13Inspect PTO Clutching Belt Tension.

Service Interval: Check every 2 hrs. for first 8 hrs. operation then check every 40 hrs. thereafter.

a)Stop engine and wait for all moving parts to stop.

b)Engage PTO lever.

c)Look through the round hole in the left rear corner of the engine deck to inspect PTO clutching belt tension. Bolt on PTO engagement linkage bellcrank and indicator arm should align within 1/16” (See figure 14). Refer to section 5.2.2 for adjustment.

5.1.14Lubrication

Service Interval: Refer to Chart.

a)Stop engine, wait for all moving parts to stop, and remove key or spark plug wire(s).

b)Lubricate fittings with one to two pumps of NGLI grade no. 2 multi-purpose gun grease. Refer to the following chart for fitting locations and lubrication schedule.

GREASE LUBRICATION CHART

FITTING

INITIAL

QUANTITY

SERVICE

LOCATIONS

PUMP

36”

48”

INTERVAL

1.

Caster Wheel Bearings

12

2

2

8 hours

2.

Caster Pivots

2

2

2

8 hours

3.

Drive Wheel Idler Arm

2

2

2

8 hours

4.

PTO Engagement Bellcrank

1

1

1

40 hours

5.

Clutch Arm Pivot

1

1

1

40 hours

6.

Mower Deck Idler Pivots

2

1

1

Yearly

7.

Trans. Output Shaft Coupler

2

2

2

40 hours

No. 5 (Clutch Arm Pivot)

Located Under Engine Deck

No. 7 (Trans. Coupler)

Located Below Fuel Tank Support

No. 3 (Idler Arm Pivots)

Disassemble and grease once a

Month under a “No Load” condition

c) Lubricate pivot points with a spray penetrating lubricant as directed below.

SPRAY LUBRICANT CHART

PIVOT POINT

 

NO. OF

SERVICE

 

PLACES

INTERVAL

 

 

1. PTO Engagement Lever

 

1

Weekly

 

- 23 -

 

 

Image 28
Contents For Serial Nos 540,000 & Higher Potential Hazard Exmark Parts PLUS→ Program Operators Manual Table of Contents Safety SpecificationsAssembly Instructions Maintenance & AdjustmentsSafety Safety Alert SymbolYour Safety is Involved TrainingCarbon monoxide can kill you Operation Potential Hazard Page Safety Signs Maintenance and StorageRiding Attachments Page Page Specifications Dimensions Assembly InstructionsTorque Requirements Speed Control Throttle Cable HOOK-UP Upper Handle MountingPTO Engagement Linkage This Clearance should be Equal Shifter Lever To Transmission Drive Lever Linkage Installation Drive Lever Setting Operation Instructions ControlsPRE-START Neutral LOCK/PARK Brake LatchOperating Instructions Drive LEVER, Neutral LOCK/PARK Brake Latch Operation Transporting Maintenance & Adjustments Periodic MaintenanceBlade Bolt Installation Must stop Page Grease Lubrication Chart Spray Lubricant ChartPage Adjustments Cutting Height AdjustmentPTO Engagement Linkage Page Trouble Shooting Waste DisposalEngine Troubleshooting Table Engine TroubleshootingProblem Wiring Diagram 15 HP Kawasaki Year Limited Warranty Page Service Record Fold Along Appropriate Line See EXMARK’S Complete Line of Accessories