Husqvarna RZ4219 BF, 966582201, 966809001 warranty Open the fuel valve

Page 26

OPERATION

8. Open the fuel valve.

8050-010

Open the fuel valve

9.Press in and turn the ignition key to the start position.

8050-135

Turn to START position

10.When the engine starts, immediately release the ignition key back to the run position.

IMPORTANT INFORMATION

Do not run the starter for more than 5 seconds each time. If the engine does not start, wait approximately 10 seconds before retrying.

8050-136

Release ignition to the RUN position

26

Image 26
Contents Operator Manual All rights reserved Contents Page Introduction Good Service Manufacturing NumberSymbols and Decals Xxxx xxxxxx xxxxx xxxx Xxxxxx xxxxxxxxx. xx xxxxxxxxManual General Operation SafetySafety Instructions Never take passengers Personal Safety Equipment Slope OperationChildren Safe Handling of Gasoline General Maintenance Risk of sparking Transport Spark ArrestorControls Control LocationsSteering Control Levers Throttle Control Ignition SwitchParking Brake Choke Control RefuelingTracking Fuel Shut Off ValveMower Deck Lifting Lever Always use the high position F to transportBlade Control Lever Bypass LinkagesSteering OperationTraining Before Starting Starting the EnginePlace controls in neutral position Open the fuel valve Jumper cables To remove cables, reverse orderRunning Operating on Hills Mowing Tips Stopping the Engine Moving Machine By Hand Maintenance Maintenance ScheduleDaily At least Maintenance interval Once Hours Each Always use protective glasses when handling the battery BatteryCleaning battery and terminals Safety System Tire PressuresTo replace deck belt BeltsDeck Belt EZT Belt Cutting BladesAdjusting the Mower Deck Leveling DeckUse protective glasses when cleaning and washing CleaningRemoval and installation of caster wheel Caster WheelsLubrication GeneralEngine Lubrication Front Wheel MountFront Wheel Bearings Steering Control ShaftsTroubleshooting Problem CauseTroubleshooting Winter Storage ServiceStorage Wiring Diagram Technical Data Torque Specifications Standard HardwareConformity Certificates USA requirementsAction Date, mtr reading, stamp, sign Service JournalDelivery Service Hour Service After the First 10 HoursService Journal At Least Once Each Year Service Journal Page 115 453827 Rev B 2011-12-12
Related manuals
Manual 76 pages 31.72 Kb Manual 40 pages 17.63 Kb