Husqvarna 966582201, 966809001, RZ4219 BF warranty Moving Machine By Hand

Page 32

OPERATION

Moving Machine By Hand

When pushing or pulling the mower, be sure to engage the EZT Hydrogear bypass linkages. The EZT bypass linkages are located on the rear of the frame, below the rear engine guard.

Raise the deck into the highest cutting position.

Pull the EZT bypass linkages out and into the slots. Release linkages to hold in the bypass position.

Release park brake.

To reengage the EZT’s to drive, reverse the above procedure.

8050-018

Set bypass linkages into slots on both sides

32

Image 32
Contents Operator Manual All rights reserved Contents Page Introduction Good Service Manufacturing NumberSymbols and Decals Xxxx xxxxxx xxxxx xxxx Xxxxxx xxxxxxxxx. xx xxxxxxxxManual General Operation SafetySafety Instructions Never take passengers Personal Safety Equipment Slope OperationChildren Safe Handling of Gasoline General Maintenance Risk of sparking Transport Spark ArrestorControls Control LocationsSteering Control Levers Throttle Control Ignition SwitchParking Brake Choke Control RefuelingFuel Shut Off Valve Mower Deck Lifting LeverTracking Always use the high position F to transportBlade Control Lever Bypass LinkagesSteering OperationTraining Before Starting Starting the EnginePlace controls in neutral position Open the fuel valve Jumper cables To remove cables, reverse orderRunning Operating on Hills Mowing Tips Stopping the Engine Moving Machine By Hand Maintenance Maintenance ScheduleDaily At least Maintenance interval Once Hours Each Always use protective glasses when handling the battery BatteryCleaning battery and terminals Safety System Tire PressuresTo replace deck belt BeltsDeck Belt EZT Belt Cutting BladesAdjusting the Mower Deck Leveling DeckCleaning Removal and installation of caster wheelUse protective glasses when cleaning and washing Caster WheelsLubrication GeneralFront Wheel Mount Front Wheel BearingsEngine Lubrication Steering Control ShaftsTroubleshooting Problem CauseTroubleshooting Winter Storage ServiceStorage Wiring Diagram Technical Data Torque Specifications Standard HardwareConformity Certificates USA requirementsAction Date, mtr reading, stamp, sign Service JournalDelivery Service Hour Service After the First 10 HoursService Journal At Least Once Each Year Service Journal Page 115 453827 Rev B 2011-12-12
Related manuals
Manual 76 pages 31.72 Kb Manual 40 pages 17.63 Kb