Husqvarna Comprehensive Manual for Drive Pulley and Trimming Blower Assembly of M-ZT Models

Page 5

ASSEMBLY

1DRIVE PULLEY

1.Remove the discharge chute from the deck by removing the side hardware from the chute bracket. Retain the hardware for reuse if the collection system is removed.

2.Lower deck to the lowest cutting position.

3.Remove the right hand (discharge side) belt cover from the deck.

Belt Cover

Discharge

Chute

Hardware

4.Relieve the tension from the deck belt and remove the belt from the center deck pulley.

(See Operator Manual if necessary)

5.Remove the nut securing the right hand deck pulley to the spindle.

6.Install drive pulley included in collection system kit on top of the current deck pulley.

7.Reinstall the nut on the spindle and torque to 55- 75 ft/lbs.

8.Reinstall the deck belt.

Drive Pulley

2TRIMMING BLOWER

1.Place blower assembly on secure table or stable surface.

2.Remove the bolts securing the rear mount bracket.

3.Using the hacksaw, trim the blower housing along the recessed grooves.

4.Reinstall the rear mount bracket with previously removed bolts.

Mount Bracket

Rear

Trim Line

3MOUNTING BLOWER ASSEMBLY

1.Position blower over the discharge tabs on the deck and set blower onto the deck.

2.Install the front mount bracket to the deck with the pin and hairpin cotter supplied with the kit.

Outer Pulley Cover

Pin

5

Image 5
Contents Operator and Parts Manual Before Assembling Grass Catcher to Mower Know Your Blower SystemContents Service Safety RulesGeneral Operation Slope Operation3MOUNTING Blower Assembly Assembly1DRIVE Pulley 2TRIMMING Blower5BELT Covers 4DRIVE Belt6BAGGER Mount 9MIDDLE Chute 8COVER Assembly7CHUTE Support 11CHUTE / Hood Installation 10UPPER Chute Assembly12WEIGHT Assembly Tips for Improved Bagging OperationGeneral Recommendations Blade CareRepair Parts Description Chutes QTY Description Item Part no Bagger Cover SUPPORT, Chute MOUNT, GUARD, Belt Description Item Part no 115 584027 Rev a 2013-02-15