ASSEMBLY
1DRIVE PULLEY
1.Remove the discharge chute from the deck by removing the side hardware from the chute bracket. Retain the hardware for reuse if the collection system is removed.
2.Lower deck to the lowest cutting position.
3.Remove the right hand (discharge side) belt cover from the deck.
Belt Cover
Discharge
Chute
Hardware
4.Relieve the tension from the deck belt and remove the belt from the center deck pulley.
(See Operator Manual if necessary)
5.Remove the nut securing the right hand deck pulley to the spindle.
6.Install drive pulley included in collection system kit on top of the current deck pulley.
7.Reinstall the nut on the spindle and torque to 55- 75 ft/lbs.
8.Reinstall the deck belt.
Drive Pulley
2TRIMMING BLOWER
1.Place blower assembly on secure table or stable surface.
2.Remove the bolts securing the rear mount bracket.
3.Using the hacksaw, trim the blower housing along the recessed grooves.
4.Reinstall the rear mount bracket with previously removed bolts.
Mount Bracket
Rear
Trim Line
3MOUNTING BLOWER ASSEMBLY
1.Position blower over the discharge tabs on the deck and set blower onto the deck.
2.Install the front mount bracket to the deck with the pin and hairpin cotter supplied with the kit.
Outer Pulley Cover
Pin
5