2 Click the added content schedule, then edit the schedule using the functions below:
1
2
34
5
6
1Deactivate the schedules assigned to the clicked day. To activate a day, click the day or add content to the day. View the playback start and end times of the content assigned to the selected schedule. To change the start or
2end time, select a time from the list of times or manually enter a time.
Adjust the playback duration of the content assigned to the selected schedule.
▪▪ Drag the borders of the schedule up or down to change the duration. You can set the duration to a
3maximum of 24 hours.
▪▪ To set the content assigned to the selected schedule to play
Simultaneously adjust the content durations for the schedules assigned to the same time slot. Drag the
4borders of the schedule up or down to change the duration.
5Copy the selected content schedule.
6Delete the selected content schedule.
3
4
After creating a schedule, click
Enter the schedule name and click Save.