Manuals
/
Brands
/
Computer Equipment
/
Network Router
/
Nortel Networks
/
Computer Equipment
/
Network Router
Nortel Networks
555-7101-215 manual
Please, tick the box below to download manual:
Contents
Main
Page
CallPilot
Installation and Configuration Part 2: 702t Server Hardware Installation
Page
Publication history
Page
Contents
1
2
3
A
Page
Page
Server features
Server dimensions
Front panel features
Page
Rear panel diagram
Refer to Slot assignments on page 14 for slot assignments.
Slot assignments
Slot definition and slot numbering
Slot assignments: 702t server with RAID
Slot assignments: 702t server without RAID
IRQ mapping table
Page
Network connectivity
Sample network setup: Meridian 1
May 2003 702t server description
Part 2: 702t Server Hardware Installation 21
Sample network setup: Succession CSE 1000
The following diagram shows a CallPilot server network setup with a Succession CSE1000 system:
Switch connectivity
LAN connectivity
Remote access connectivity
Supported peripheral devices
Page
Installation overview
Installation checklist
Page
Conventions for warnings
Unpacking the 702t server
To unpack the equipment
Page
Removing the side panel
To remove the side panel
Note: The illustration shows a customer-supplied padlock (A).
Page
Inspecting the server interior
Protective foam
To remove protective foam and inspect the server interior
Page
Page
Page
Installing the server
Preparing the modem
Required equipment
Modem DIP switches
To set the modem DIP switches
Page
Connecting peripherals to the server
Before you begin
Rear panel
The following diagram shows the server connectors for the power cord and the peripheral devices:
To connect the mouse, keyboard, and monitor to the server
To connect the modem to the server
Continue with Connecting the server to the ELAN on page 46.
Connecting the server to the ELAN
Media Access Control address
To connect the server to the ELAN
Page
Connecting the server to the CLAN (optional)
Media Access Control address
To connect the server to the CLAN
Page
Page
Page
Connecting the server to power
Before you begin
May 2003 Installing the server and connecting the peripheral devices
Part 2: 702t Server Hardware Installation 53
CallPilot server
To connect the server to power
To start the server
Page
Page
Appendix A
EMC emission level protection for the 702t Server
Page
Index
A
C
D
E
K
M
N
P
R
T
U
Page
Page
CallPilot
Installation and Configuration Part 2: 702t Server Hardware Installation