Manuals
/
Brands
/
Laundry Appliance
/
Clothes Dryer
/
Whirlpool
/
Laundry Appliance
/
Clothes Dryer
Whirlpool
W10115228B, W10115229B-SP installation instructions
Please, tick the box below to download manual:
Contents
Main
W10115228B W10115229B-SP
Table of Contents
NOTES CONCERNANT LINSTALLATION
INSTALLATION NOTES
Page
Page
Tools and Parts
Tools needed for all installations:
Tools needed for gas installations:
INSTALLATION REQUIREMENTS
Parts needed:
Optional Equipment:
Parts supplied:
Location Requirements
29" Wide Models Dryer Dimensions
Installation Spacing
Installation clearances:
27" Wide Models Dryer Dimensions
Installation Spacing
ELECTRIC DRYER POWER HOOkUP CANADA ONLY
Prepare dryer for leveling legs
Electrical Requirements
It is your responsibility:
GAS DRYER POWER HOOkUP
Gas Supply Requirements
Gas type
Screw in leveling legs
Gas supply line
Electrical Requirements
GROUNDING INSTRUCTIONS
SAVE THESE INSTRUCTIONS
WARNING: Improper connection of the equipment-
Dryer gas pipe
VENTING
Recommended Styles:
Plan Vent System
Recommended exhaust installations
Optional exhaust installations:
Alternate installations for close clearances
Venting kits
Install Vent System
Install exhaust hood
Special provisions for mobile home installations:
Determine vent length and elbows needed for best drying performance:
Vent System Chart (29" Wide Long Vent Models Only)
Connect Vent
Connect vent to exhaust outlet
Make Gas Connection
Move dryer to nal location
Connect vent to exhaust hood
Level Dryer
Level dryer
NOTE: Magnetized screwdriver is helpful.
Tighten and adjust leveling legs
Complete Installation Checklist q
Page
Page
Page
Page
Page
Page
Page
14.
Troubleshooting
Page
Page
EXIGENCES DINSTALLATION
Outillage et pices
Pices ncessaires :
quipement facultatif :
Exigences demplacement
Outils ncessaires aux installations au gaz :
Pices fournies
Modles de 29" de largeur Dimensions de scheuse
Espacement pour une installation
B
A
*Espacement requis
RACCORDEMENT LALIMENTATION LECTRIQUE DE LA SCHEUSE LECTRIQUE CANADA SEULEMENT
Installation des pieds de nivellement
RACCORDEMENT DUNE SCHEUSE GAz
Spcications de lalimentation en gaz
Type de gaz
Visser dans les pieds de nivellement
Prparer la scheuse pour les pieds de nivellement
Canalisation de gaz
Exigences concernant le raccordement au gaz
Canalisation darrive de gaz de la scheuse
Caractristiques dalimentation du brleur
Spcications lectriques
INSTRUCTIONS DE LIAISON LA TERRE
CONSERVEZ CES INSTRUCTIONS
AVERTISSEMENT : Le raccordement incorrect de
Exigences concernant levacuation
LVACUATION
Styles recommands :
Planication du systme dvacuation
Installations dvacuation recommandes :
Installations dvacuation facultatives :
Installations alternes pour dgagements troits
Trousses devacuation
Tableau des systmes dvacuation
2
3
4
1
Installation du circuit dvacuation
Installer le clapet dvacuation
Robinet darrt du gaz ouvert
Raccorder le conduit dvacuation au clapet
Prparer la connexion des raccords de tuyauterie
Raccordement du conduit dvacuation
Rglage de laplomb de la scheuse
Page
Page
Page
ter les vis des charnires
Faire pivoter la porte externe
ter les vis du panneau de porte
Retourner la porte
Page
Page
ter les vis des charnires
Retourner la porte
Fixer les charnires de porte
ter les vis du panneau de porte
Faire pivoter la porte externe
Page
Page
Page
14.
Dpannage