![](/images/new-backgrounds/1108521/1085219x1.webp)
5 |
Unpacking Use the following procedure when you unpack a FEN Switching Module:
Instructions
1Verify that the module is the correct product by matching the 3C number that is listed on the shipping box label to the 3C number that you ordered (Model Number 3CB9LF10MC for the
2Remove the module, in its antistatic bag, from the shipping box.
3Observing the caution instructions, remove the module from its antistatic bag and inspect it for physical damage.
CAUTION: Handle the module only by the front panel. Do not touch any components, pins, leads, or solder connections.
If the module appears to be damaged, replace it in the antistatic bag, put it back in the shipping box, and contact your network supplier.
4Verify that the box also contains:
■CoreBuilder 9000 Release Notes for the Fast Ethernet and Gigabit Ethernet Layer 2 Switching Modules
■
If the listed contents are not in your shipping box, contact your network supplier.
All shipping boxes are reusable. After you remove the contents, replace the packing materials in the box and store it for future use.