30CHAPTER 2: INSTALLING THE SWITCH
| Table 5 | LED colors | |
|
|
|
|
| Color | State | |
|
|
|
|
| Green | The Switch is | |
|
| operating normally | |
| Yellow | The Switch has failed its Power On Self | |
|
| Test. This occurs if any of the ports fail | |
|
| during | |
| Off | The Switch is not receiving power. | |
|
|
| |
| If there is evidence of a problem, see “Solving Problems Indicated by | ||
| LEDs” on page 31. | ||
|
|
| |
Choosing the | All of the ports on the front of the Switch 3300 SM are configured as | ||
Correct Cables | MDIX | ||
| port, you need a | ||
|
workstations and servers are configured as MDI
Figure 10 Connecting other devices to the Switch 3300 SM
1x
13x
6x 7x
18x 19x
12x
24x
|
|
|
|
| |||||||||||
|
|
|
|
| green = enabled, link OK |
|
|
|
|
| |||||
|
| flashing green = disabled, link OK |
|
|
|
| |||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Packet | |||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Status | |||
13 | 14 | 15 | 16 | 17 | 18 19 | 20 | 21 22 | 23 | 24 | Packet | |||||
13 | 14 | 15 | 16 | 17 | 18 19 | 20 | 21 22 | 23 | 24 | Status |
|
Unit
1 | 2 |
|
|
3 | 4 |
|
|
5 | 6 | Power/Self Test | ® |
7 | 8 |
| SuperStack II |
Switch 3300 SM
MDIX
MDI
Hub Workstation
Switch
Server