3Com 5101T-FB-ST, 5101T-FB-SMA, 5101T-FB-FC manual Site Preparation and Placement

Models: 5101T-FB-ST 5101T-FB-SMA 5101T-FB-FC

1 52
Download 52 pages 48.45 Kb
Page 20
Image 20

Site Preparation and Placement

The 10BASE-FB Transceiver can be placed in the following locations:

On top of the device to which it is attached

On top of a desk

Attached directly to the AUI connection on the DTE

To avoid damage to the Fiber Optic cable and prevent accidental disconnection from the AUI cable, secure the transceiver and cables connec- tions.

3Com offers a velcro mount kit

(part # 9300-TM3) to secure your transceivers. To order this kit, contact your supplier or call 3Com Technical Support.

Page 12

Page 20
Image 20
3Com 5101T-FB-ST, 5101T-FB-SMA, 5101T-FB-FC manual Site Preparation and Placement