Operation (Continued)

Automatic Operating Procedure

(Bottom Taping Only)

1.Raise case sealer upper taping head to maximum height (if applicable).

2.Turn case former air valve "On" (SUP).

3.Turn Manual/Auto valve to "Auto".

4.Place open box with front and back bottom flaps folded in, onto the case former center rail.

5.Move box forward (toward case sealer) until both side bottom flaps contact the bottom flap actuator plates. The two bed plates will then rotate up and fold the side box flaps up.

The box ejector will automatically push the box into the case sealer and then return to the rest position ready for the next box.

14

Page 18
Image 18
3M 300cf manual Automatic Operating Procedure