A.O. Smith GB/GW-300, 500, 750 SERIES, 650 warranty Description of FCB control states, Idle State

Models: 500 750 SERIES 650 GB/GW-300

1 24
Download 24 pages 5.82 Kb
Page 12
Image 12

except the fault states. If enabled the powered vent and the IRI gas valve are turned on. A command is sent to all active stages to cold purge the system. Cold purging clears out any combustion gas that may be in the combustion chamber. When purging is complete the system moves to the Heat State.

Heat Stages 1-4:

The system will command the FCB micros to start their heat sequence starting with stage 1. Stages 2 through 4 will be activated in order based on an algorithm that determines how much heat is needed. The system will remain in this state until the heat request is satisfied, the Tstat is opened, or a fault occurs.

Soft Fault State: (See “Fault Description” section for list of soft and Auto Reset faults.)

The CCB turns off the Powered Vent and the IRI Gas. The pump remains on for the selected post-circulate time to cycle the hot water out of the boiler. The FCB’s are commanded to shut down and the Alarm output is turned on. The green LED turns off and the red “Service” turns on. The CCB remains in this state until one of the following occurs:

One hour passes (Soft fault automatic restart after one hour)

If Communications error system will automatically restart when communications are reestablished.

If user presses Select key while current error screen is displayed (Hard reset).

If high-limit error - the outlet temperature drops below the high limit trip point minus the high limit differential. (outlet water temperature drops to safe level).

The fault is logged in the error history when the fault state is exited.

Hard Fault State: (See "Fault Description" section for list of soft and Auto Reset faults.) The CCB turns off the Powered Vent and the IRI Gas. The pump remains on for the selected post-circulate time to cycle the hot water out of the boiler. The FCB's are commanded to shut down and the Alarm output is turned on. The green LED turns off and the red "Service" turns on and off (flashes). The only way to exit this state is for the user to press the Select key while the current error screen is displayed. The fault is logged in the error history when the fault state is exited.

While the CCB is in the Heating mode the activated FCB stage moves from Idle, to Pre-Purge, to Heat Igniter, to Check for Flame, and then to Heating. The process waits in this state until the call for heat is satisfied, the thermostat input is opened, or a fault occurs. When heat is satisfied, the sequence continues to Post-Purge and then back to Idle. If three tries for ignition has been selected on the CCB dipswitch and flame is not detected at the appropriate time, then the sequence moves to the Inter-Purge state for 15 seconds and the FCB heat sequence is repeated. If flame is still not detected after the third try the process declares a fault, jumps out of sequence and goes to the error state. Other types of faults detected at any time will also cause a jump to the error state.

Description of FCB control states:

Idle State:

If a Silicon Carbide Igniter is being used then its condition is determined and any error is declared. The system will remain in this state until the CCB requests a heating cycle or a cold purge. The blowers, igniter, and gas relay are turned off.

Pre-Purge State:

If the stage does not have a blower, this state is skipped and the system advances to the Heat Igniter State. Otherwise the Blower is turned on. After 10 to 34 seconds (34 seconds for

cold purging) the system switches to the Heat Igniter State.

Heat Igniter State:

The sequence of operation is as follows: "The igniter relay is energized and the heat up period begins. After 18-20 seconds, if the igniter has reached a minimum of 2.8 amps, the gas valve safety circuit is then activated. If in this amount of time, the igniter fails to reach a minimum amp draw of 2.8 amps, the unit will re-cycle up to 3 times before locking out on igniter hardware failure. If the igniter does reach the minimum required amp draw of 2.8 amps, the gas valve circuit is energized, and the FCB advances to Flame Check status. If flame is proven, the unit continues in run mode until set point is reached.

Check for Flame State:

The gas valve is turned on. After 1.5 seconds, the system checks that the gas valve relay is on. If it is not, the ignition trial is considered to have failed and the system advances to the Inter-Purge state, if any ignition trials remain, otherwise an error is declared.

The flame sensor is checked. If flame is detected, the igniter is turned off. The boiler then advances to the Heating State. If after 5 seconds, the flame is still not sensed then the ignition trial is considered to have failed. The boiler advances to Inter-Purge if any ignition trials remain, otherwise an error is declared.

Heating State:

The system remains in this state until the call for heat is cancelled or a fault occurs. The system returns to the Idle state if the call for heat is cancelled and to the appropriate fault state if a fault occur.

Inter-Purge State:

The gas valve and the igniter are turned off. The system goes back to the Heating Igniter State.

Post-Purge State

The gas valve and the igniter are turned off. If this stage does not have a blower the system returns to the idle state.

Error State

The gas valve and the igniter are turned off. The FCB micro tells the CCB micro which error has occurred. The system waits in this state until the CCB sends a command to clear the error. Then the Silicon Carbide Circuit is reset and the system returns to the idle state.

Cold Purge State

Cold purge occurs when the CCB micro commands all blowers to go on before lighting the first stage to purge the unit of gases. This state normally lasts approximately 32 seconds but on a special situation can last up to 5 minutes. If on the first call for heat after power up, any blower prover switch is open, this state will take up to 5 minutes before declaring an error. This special mode is used by service technicians to adjust the blower shutters.

The CCB will wait the normal cold purge time (normally 32 seconds) before checking for activation of all active blower provers. If all are active at this time the CCB cancels the cold purge request. After the first cold purge has been done a flag is set to prevent further activation of the shutter adjust 5 min. delay. Any further requests for cold purge will last the normal cold purge time. The FCB will go into fault mode if the blower prover does not activate after 15 seconds. This time allows the blower relay to activate, the blower to come up to speed, and the response from the blower prover to be filtered.

12

Page 12
Image 12
A.O. Smith GB/GW-300, 500, 750 SERIES, 650 warranty Description of FCB control states, Idle State

500, 750 SERIES, 650, GB/GW-300 specifications

The A.O. Smith GB/GW-300, 650, 750 Series, and 500 represent a cutting-edge line of commercial water heaters designed to meet the diverse needs of various applications. These models are highly regarded for their advanced features, robust construction, and reliable performance, making them ideal for businesses such as restaurants, hotels, and industrial facilities.

One of the main features of the A.O. Smith GB/GW series is its high-efficiency design. These water heaters are built with advanced insulation and heat exchanger technology, which contribute to reduced energy consumption and lower operating costs. The products achieve notable energy efficiency ratings, ensuring that businesses can maintain their hot water supply without incurring excessive utility bills.

The GB/GW series also incorporates a user-friendly digital control system. This technology allows operators to monitor and adjust settings easily, providing real-time feedback on temperature and energy consumption. This level of control enhances operational efficiency and ensures hot water is always available when needed.

Another significant characteristic of the A.O. Smith GB/GW series is its durable construction. The units are designed with high-quality materials that resist corrosion and wear, extending their operational lifespan. The stainless steel tanks and heat exchangers are engineered to withstand high temperatures and pressure, making them reliable even in demanding environments.

Moreover, safety features are paramount in the design of these water heaters. The series includes multiple safety mechanisms, such as high-temperature limit switches and pressure relief valves, ensuring the safe operation of the unit at all times. This not only protects the equipment but also guarantees the safety of personnel using hot water.

The GB/GW series ranges in capacity, accommodating different sizes of operations. From the compact and efficient 300 model to the larger 650 and 750 units, the series offers flexibility to suit various demands. The 500 model strikes a balance between capacity and efficiency, making it a popular choice for medium-sized establishments.

In summary, the A.O. Smith GB/GW-300, 650, 750 Series, and 500 are exemplary choices for commercial water heating solutions. Their combination of efficiency, advanced technology, durable design, and comprehensive safety features ensures that businesses have access to reliable hot water, ultimately supporting their operational needs and enhancing service delivery.