Chapter 3

Installation

This chapter covers:

PreparationConnectors and JumpersSafety ConsiderationsController Installation ProceduresBefore You Begin

Installing a Mylex DAC960 PCI to Ultra SCSI RAID controller is no more difficult than installing any PCI adapter. Follow these steps and then follow the installation procedures in this chapter.

￿WARNING

Disconnect the system from the electrical wall outlet before opening the system cabinet. Working with the system covers off and power applied to the system can result in shock and serious injury.

1.Read all of the instructions in this chapter completely before proceed- ing. Follow the Notes, Cautions, and Warnings described in this manual and marked on the equipment.

2.Power off the system and disconnect the power cables before starting the installation.

3.Follow electrostatic discharge (ESD) safety procedures. Use grounded wrist straps or ESD-safe footwear, and work in an ESD-safe area.

4.Perform a safety check on the installation before powering on the system.

Make sure that all of the cabling Pin 1 locations are correct and that all cables are firmly seated in the connectors.

Make sure all SCSI conventions (cable type, cable length, termination, SCSI IDs, etc.) are followed.

Manual No. 775012

3-1